Kia Dealership Amy Johnson Way Lytham St Annes Lancashire FY4 2RP Data via plota.co.uk

26/0580 - Advertisement Consent Under Consideration

Proposal

Advertisement consent for re-location of existing internally illuminated totem sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Nov 2026 and 23 Dec 2026, from Fylde's recent commercial premises.

Comments are open until 27 Oct 2026

Comment on this application ↗

Site constraints 3

Article 4 direction
Article 4 Direction - C3 to C4 HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project about 684 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 684 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Blackpool built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fylde - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fylde
Application type
Advertisement Consent
Postcode
FY4 2RP
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
Kilgrimol
Parish
St Anne's on the Sea
Case officer
Show
Applicant
Show
Agent
Sign Specialists Ltd

Decision outlook

Day 8 of the 56-day target. Fylde usually decides commercial premises by day 69.

Day 861 days to the predicted decision (day 69)
41%decided within 8 weeks
98%approved
6%go to committee

Plota live figures for commercial premises decided by Fylde in the last twelve months, from validation. Fylde decision record →

Consultation & key dates

Consultation
6 Oct 2026
Comments by
27 Oct 2026
Fylde
Planning Authority Score
5.3/10
Average
#130 of 296 councils
Relevant to this application:
Other decisions

Fylde ranks #184 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Fylde decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #11 of 296
98%
Householder approved
Above avg (90%) #17 of 296
60%
Decided in 8 weeks
Below avg (63%) #184 of 296
49%
Extended time limit
Above avg (41%) #220 of 296
79%
Minor dwellings approved
43 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
100%
Change of use approved
28 decided
422
Total decisions
16 refused in the year to March 2026