West Scales Farm Rigg DG16 5JH

Pending 26/0744/FUL
Council
Date received
4 May 2026
Date validated
7 May 2026
Postcode
DG16 5JH

Description

INSTALLATION AND OPERATION OF AN ENERGY PARK COMPRISING ERECTION OF 4 WIND TURBINES (MAXIMUM HEIGHT TO BLADE TIP 200 METRES), METEOROLOGICAL MAST, SOLAR PHOTO VOLTAIC PANELS, BATTERY ENERGY STORAGE SYSTEM, ACCESS TRACKS, ACCESS JUNCTION, UNDERGROUND CABLING, SUBSTATION WITH CONTROL BUILDING UP TO TWO TEMPORARY CONSTRUCTION COMPOUNDS AND ASSOCIATED WORKS