Land Between Newlands and 1 Seaview Marsh Lane Longton Preston Lancashire PR4 5LA Data via plota.co.uk

07/2025/00784/PIP - Permission in Principle Refused

Proposal

Permission in principle for the erection of up to 5no. dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Oct 2025
✓
Validated
9 Oct 2025
✓
Consultation
13 Oct 2025
✗
Refused
12 Nov 2025
✗
Appeal dismissed
9 Jul 2026

Refused on 12 Nov 2025 · Delegated Decision · Last checked 11 Oct 2026

Site constraints 8

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project: East Irish Sea Transmission Project, at pre-application; Flood defence 29 m away (natural high ground, designed for a 1 in 10 year flood); Inside the Longton built-up area; Priority habitat 32 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Ribble - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Permission in Principle
Postcode
PR4 5LA
Received
6 Oct 2025
Validated
9 Oct 2025
Ward
Longton and Hutton West
Parish
Longton Parish Council
Case officer
Show
Target decision
13 Nov 2025
Decision
Refusal
Decision date
12 Nov 2025
Decision level
Delegated Decision
Appeal
Dismissed · 9 Jul 2026 · Written Representations · Inspectorate case 6003580 ↗
Applicant
Show
Agent
BPD Architecture

How this decision compares

Decided in 34 days from validation, 13 days faster than South Ribble's median of 47 for new homes. Refused, as 18% of new homes here are.

65%decided within 8 weeks
82%approved
55decided in the last year

Plota live figures for new homes decided by South Ribble in the last twelve months, from validation. South Ribble decision record →

Public comments

31comments received
31 objecting

100% object · above the UK average of 74%

6 neighbours consulted · Last counted 11 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
13 Oct 2025
Consultation
13 Oct 2025
Comments by
4 Nov 2025
Statutory expiry
13 Nov 2025
Env. assessment
No
South Ribble
Planning Authority Score
7.8/10
Good
#30 of 296 overall
Relevant to this application:
Householder decisions

South Ribble is faster than most councils at deciding householder applications: #79 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Ribble decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #27 of 296
99%
Householder approved
Above avg (90%) #7 of 296
75%
Decided in 8 weeks
Above avg (63%) #79 of 296
36%
Extended time limit
Below avg (41%) #115 of 296
95%
Minor dwellings approved
41 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
92%
Change of use approved
12 decided
389
Total decisions
18 refused in the year to March 2026