Carbon capture plant at Parc Adfer Ltd, Zone 4, Deeside Industrial Park, Weighbridge Road, Sealand, Deeside
Summary of planning committee decision
Decided by Flintshire Planning Committee on 4 Nov 2026.
What was proposed
The application proposed a carbon capture plant and associated works, including process equipment, an approximately 85-metre stack, buildings, roads, drainage and ecological measures.
“The proposed CCS retrofit is designed to capture up to 95% of the facility's annual carbon dioxide emissions (approximately 230,000– 241,000 tonnes of CO₂ per year), to be compressed, dehydrated and exported via pipeline to the wider regional carbon capture and storage network known as HyNet for permanent geological storage offshore in the Liverpool Bay.”
“-associated drainage upgrades, hardstanding, internal roads, car parking and landscape/ecological mitigation works. 7.05The application is accompanied by an Environmental Statement, Planning, Design and Access Statement, Landscape and Ecological Management Plan (LEMP), Green Infrastructure Statement and associated technical appendices, prepared in accordance with the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017.”
Officer report
The site's planning history
The existing energy recovery facility was permitted in 2015, became operational in 2019, and later received permission to increase waste-processing capacity.
“Waste Treatment Project’; a regional collaboration to provide long- term, sustainable management of non-recyclable municipal waste, reducing the volume of material going to landfill and generating low carbon energy in the process, together with residual commercial and industrial waste. 5.03Planning permission Ref: 052626 was granted on 9 th June 2015 on a temporary basis until 31 December 2050.”
“5.04The ERF has been operational since 2019 and has continued to evolve through the discharge of conditions, Non-Material Minor Amendments, and further approvals, including permission to increase capacity from 200,000 tpa to 232,000 tpa under planning reference 061862, and the Ecological Management Plan and Ecological Compliance Audit Scheme (SLR, August 2015), superseded on a site-wide basis by the Landscape Environmental Management Plan (LEMP) now submitted in support of…”
Officer report
What consultees said
The town council supported the proposal, highways had no objection, and consultees’ concerns were addressed or capable of control through conditions.
“3.05Connah’s Quay Town Council: Support on both occasions consulted (December 2025 and June 2026); no objection provided the development follows planning policy. 3.06Highways Development Control: Response 12 January 2026 (unchanged on re-consultation).”
“However, Officers are satisfied that the matters raised by DCWW can be addressed and controlled through the conditions set out at Conditions 21 and 22 above 3.15Network Rail: No objection to the principle of the development, or to the principle of the carbon capture proposal.”
Officer report
The committee's decision
The committee approved the application in accordance with the officer recommendation, subject to the stated conditions and Late Observations A6.
“FUL/000916/25 - Full application for the construction and operation of post-combustion carbon capture plant and associated works at Parc Adfer Ltd, Deeside Industrial Park, Sealand, Deeside Approved in accordance with the Officer’s Recommendation subject to the conditions set out in the Officer’s Report and Late Observations A6”
Minutes
Councillors at the meeting
- Cyng Richard LloydChairLabour
- Cyng Sean BibbyLabour
- Cyng Chris BithellLabour
- Cyng Adele Davies-CookeConservative
- Cyng Chris DolphinIndependent
- Cyng Carol EllisIndependent
- Cyng Paul JohnsonLab Co-op
- Cyng Allan MarshallIndependent
- Cyng Billy MullinLabour
- Cyng Andrew ParkhurstLib Dem
- Dave VernonReform UK
Apologies Cyng Bill Crease Independent, Cyng Paul Cunningham Labour, Cyng Mike Peers Reform UK
Source: Plota analysis of the council's record of attendance; parties from the council's list of councillors and Democracy Club.
Sources
- Flintshire Planning Committee minutes, 4 November 2026
- Agenda and papers (council website)
Source: Plota analysis of Flintshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Flintshire Planning Committee
- Council
- Flintshire
- Date
- Wednesday 4 November 2026
- Committee decided
- Approved
- Councillors
- 11Labour 4Independent 2Conservative 1Lab Co-op 1Lib Dem 1Reform UK 1Independent 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Flintshire committee decisions →
This committee's year
26 decisions in the 12 months to this meeting, 3 against officer advice.
Source: Plota analysis of the committee's minutes.