Solar panels on church roof at St Annes Church, Ings, Kendal

Summary of planning committee decision

Decided by Lake District Development Control Committee on 2 Sept 2026.

7/2026/5215ApprovedAgainst officer advice

What was proposed

The application sought permission for 22 surface-mounted solar panels on the church’s south-facing roof.

“Planning permission (7/2023/5474) was refused in November 2023 for the installation of a 28-panel array of solar PV panels on the south facing roof. An appeal against this refusal was lodged but dismissed by the Planning Inspectorate in October 2024 (see Appendix A).”

“This application now seeks planning permission for the installation of 22 surface mounted PV solar panels on the south facing roof.”

Officer report

The site

The church is a Grade II* listed building in Ings, beside a churchyard bounded by the A590 and Church Lane.

“St Anne’s Church is a Grade II* listed building within the settlement of Ings. The church is located to the south-western corner of the churchyard. The churchyard is bound by the A590 to the north and Church Lane to the east, south and west.”

Officer report

Earlier applications

A previous 28-panel proposal was refused in 2023, and an appeal was dismissed in 2024.

“Lake District National Park Authority Development Control Committee – 5 August 2026 7/2026/5215 granted by the Diocese of Carlisle (Application reference 2023-087670) in May 2024. A condition of this judgment is that the works cannot take place until planning permission is granted.”

Officer report

What officers recommended

Officers recommended refusal because the panels would harm the listed building, World Heritage Site and local character, without sufficient public benefits to outweigh that harm.

“The proposals would result in harm to the significance of a Grade II* listed building, would adversely impact on the outstanding universal values of the English Lake District World Heritage Site and would adversely impact on the character of the local area.”

“This would represent a visual intrusion, disruption and contrast to the consistency of materials displayed in the building and surrounding local area resulting in harm to the significance of the Grade II* listed building, an adverse impact on the outstanding universal values of the English Lake District World Heritage Site and adverse impact on the character of the local area.”

Officer report

Residents’ views

Forty-four representations supported the proposal for renewable energy and lower costs, while one comment preferred panels on other roof slopes.

“We have received 44 representations of support which can be summarised as follows: • The number of solar panels proposed has been reduced. • Negligible damage to the roof. • Minimal visual impact. • Public benefit through reduced heating costs for the church and renewable energy. • Solar panels have been installed on other listed buildings. • The benefits of the scheme outweigh the harm.”

“We have received one comment which can be summarised as follows: • Solar panels are unattractive, particularly on an old church. • Would support the application if the panels were on the north-west roof or east roof.”

Officer report

The main planning issue

The panels would obscure most of the weathered slate roof and cause less than substantial harm that the identified public benefits would not outweigh.

“The addition of this substantial solar array would largely obscure the existing greenslate roof from view. It would mask the visibility of this traditional, natural material, with its inherent uneven and weathered appearance, with a solid expanse of uniform panels with an engineered and artificial appearance.”

“In this instance, the panels would be installed on a prominent elevation and would be highly visible from Church Lane. The assessment of the proposals undertaken by the Authority, Planning Inspectorate and Diocese of Carlisle have all been consistent in concluding that such development would result in less than substantial harm to the significance of this Grade II* listed building.”

Officer report

What members debated

Members discussed whether the public benefit outweighed the identified harm to the heritage asset.

“After detailed discussion of whether the public benefit outweighed identified harm to the heritage asset, [name withheld] put forward a proposal to approve the application with conditions.”

Minutes

The committee vote

Members voted four to three for a motion to approve the application with conditions.

“Motion to approve the application with conditions Proposed by [name withheld] by [name withheld] in favour of motion: Members against the motion: 3”

Minutes

The decision

The application was approved with conditions, including a three-year time limit and removal if the panels are no longer required.

“Motion to approve the two conditions (a three-year time limit to commence development and requirement for removal if no longer required) as noted in the report.”

“Decided: To apply the conditions listed in the report…”

Minutes

The members' reasons

The minutes do not record the members' reasons for departing from the officers' recommendation.

Sources

  • Lake District Development Control Committee minutes, 2 September 2026
  • Agenda and papers (council website)

Source: Plota analysis of Lake District's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Date
Wednesday 2 September 2026
Recommendation
Officers recommended refusal
Committee decided
Approved, against officer advice
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

69 decisions in the 12 months to this meeting, 5 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →