Gwaun Hepste Four Waterfalls Car Park Aberdare CF44 9FJ Data via plota.co.uk

26/24567/FUL - Full Application Approved

Proposal

Redevelopment and Extension of the Existing Car Park and erection of toilet block and visitor building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Apr 2026
✓
Approved
9 Sept 2026

Approved on 9 Sept 2026 · Committee Decision · Last checked 10 Sept 2026

Planning committee

Decided by Brecon Beacons Planning Committee on 8 Sept 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • Officers advised granting permission subject to planning conditions.
  • Members noted that the remote site’s lack of electricity would prevent installing EV charging points.
  • Members agreed to delegate permission to the Director of Planning and Place, subject to conditions.
Read how the committee decided The proposed redevelopment, members’ discussion and the committee’s decision. Includes the meeting recording

Source: Plota analysis of Brecon Beacons's committee minutes of 8 Sept 2026.

Documents 91

Plans & drawings 21

PDF 61331 version p2 dated 04/08/2026 Construction environmental management plan SupportingDocs · 5 Aug 2026 View ↗ PDF 51098-tacp-xx-xx-d-13001 rev p5 Landscape ga plan Plan Approved · 3 Aug 2026 View ↗ PDF 61331 version p2 dated 24/07/2026 Inns management plan SupportingDocs · 3 Aug 2026 View ↗ PDF 260200433grsa-12499 Floor plan and elevations Plans · 27 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10102 s4 Series 100 - preliminary option development general arrangement Plans · 27 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10104 s4 Series 100 - preliminaries site location plan Plans · 27 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10122 s4 Series 100 - preliminaries proposed site elevations sheet 2 Plans · 27 Apr 2026 View ↗ PDF 16:36 with rev plans Agent email Correspondence · 27 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10121-p3 Proposed site elevations sheet 1 Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10122-p2 Proposed site elevations sheet 2 Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10151-p3 Construction details sheet 1 Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10152-p1 Construction details sheet 2 Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10153-p1 Construction details sheet 3 Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10601-p3 Existing contours Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10602-p3 Proposed contours Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10701-p3 Vehicle tracking Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10102-s4 General arrangement Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10103-p3.1 Existing site layout Plans · 20 Apr 2026 View ↗ PDF 51098-bur-xx-xx-d-c-10104-p3 Site location plan Plans · 20 Apr 2026 View ↗ PDF 260200433grsa-12499 Green retreat structure Plans · 20 Apr 2026 View ↗ PDF 51098-tacp-xx-xx Landscaping ga plan Plans · 20 Apr 2026 View ↗

Consultation & comments 29

PDF 14:30 response to agent Npeco email Correspondence · 25 Aug 2026 View ↗ PDF Npeco ConsulteeResponse · 24 Aug 2026 View ↗ PDF 09:24 response to npeco Agent email Correspondence · 20 Aug 2026 View ↗ PDF Npeco email ConsulteeResponse · 19 Aug 2026 View ↗ PDF Pccep ConsulteeResponse · 7 Aug 2026 View ↗ PDF Datblygu tir sydd wedii halogi canllaw i ddatblygwyr 2023 Pccep ConsulteeResponse · 7 Aug 2026 View ↗ PDF 16:26 with pccep comments Admin email Correspondence · 7 Aug 2026 View ↗ PDF 09:24 response to agent Officer email Correspondence · 6 Aug 2026 View ↗ PDF 09:52 response to agent Officer email Correspondence · 6 Aug 2026 View ↗ PDF Nparch ConsulteeResponse · 15 Jul 2026 View ↗ PDF 13:39 response to agent Officer email Correspondence · 17 Jun 2026 View ↗ PDF 09:26 response to officer Agent email Correspondence · 11 Jun 2026 View ↗ PDF Nptc3 ConsulteeResponse · 10 Jun 2026 View ↗ PDF Npeco ConsulteeResponse · 22 May 2026 View ↗ PDF Pccdrn email ConsulteeResponse · 18 May 2026 View ↗ PDF Nrw ConsulteeResponse · 18 May 2026 View ↗ PDF Pcchig ConsulteeResponse · 13 May 2026 View ↗ PDF Ysdftc Consultee initial Correspondence · 1 May 2026 View ↗ PDF Pcchig Consultee initial Correspondence · 1 May 2026 View ↗ PDF Pccep Consultee initial Correspondence · 1 May 2026 View ↗ PDF Pccdrn Consultee initial Correspondence · 1 May 2026 View ↗ PDF Pccsab Consultee initial Correspondence · 1 May 2026 View ↗ PDF Nrw Consultee initial Correspondence · 1 May 2026 View ↗ PDF Cadw2 Consultee initial Correspondence · 1 May 2026 View ↗ PDF Nptc3 Consultee initial Correspondence · 1 May 2026 View ↗ PDF Nparch Consultee initial Correspondence · 1 May 2026 View ↗ PDF Npeco2 Consultee initial Correspondence · 1 May 2026 View ↗ PDF Nprow Consultee initial Correspondence · 1 May 2026 View ↗ PDF Nprow email ConsulteeResponse · 1 May 2026 View ↗

Other documents 25

PDF 14:12 dn sent to agent, ysdftc, pcchig, pcc lcharges Admin email Correspondence · 9 Sept 2026 View ↗ PDF 14:14 with additional info Agent email Correspondence · 3 Sept 2026 View ↗ PDF 18:33 01.09.26 to ysdftc Admin manager email Correspondence · 2 Sept 2026 View ↗ PDF Committee notify letter Admin manager email Correspondence · 2 Sept 2026 View ↗ PDF 18:40 01.09.26 to agent re committee Admin manager email Correspondence · 2 Sept 2026 View ↗ PDF Committee notify agent/app Correspondence · 1 Sept 2026 View ↗ PDF 13:53 update to agent Officer email Correspondence · 27 Aug 2026 View ↗ PDF 09:13 to npeco Agent email Correspondence · 25 Aug 2026 View ↗ PDF 14:54 req eot to 09.09.26 Officer email Correspondence · 25 Aug 2026 View ↗ PDF 15:55 agree eot Agent email Correspondence · 25 Aug 2026 View ↗ PDF 10:58 with leemp Agent email Correspondence · 21 Aug 2026 View ↗ PDF 11:33 with leemp Agent email Correspondence · 21 Aug 2026 View ↗ PDF 09:06 to npeco Agent email Correspondence · 19 Aug 2026 View ↗ PDF Tn-260806 dated 07/08/2026 Technical note proposed waterless toilet SupportingDocs · 7 Aug 2026 View ↗ PDF 17:18 04.08.26 with cemp Agent email Correspondence · 5 Aug 2026 View ↗ PDF 15:54 with supporting info Agent email Correspondence · 3 Aug 2026 View ↗ PDF 08:35 update to agent Officer email Correspondence · 11 Jun 2026 View ↗ PDF 10:55 req for update Agent email Correspondence · 8 Jun 2026 View ↗ PDF 13:08 req for info Officer email Correspondence · 28 May 2026 View ↗ IMG 20260514 site notice Publicity · 14 May 2026 View ↗ PDF Applicant agent acknowledgement feb23 Correspondence · 1 May 2026 View ↗ PDF Eia screening EIAScreening · 30 Apr 2026 View ↗ PDF 09:52 update to applicant Officer email Correspondence · 29 Apr 2026 View ↗ PDF November 2024 Ground investigation factual report SupportingDocs · 20 Apr 2026 View ↗ PDF Cover letter SupportingDocs · 20 Apr 2026 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 2

Brecon Beacons National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brecon Beacons - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
CF44 9FJ
Received
24 Apr 2026
Validated
24 Apr 2026
Case officer
Show
Target decision
9 Sept 2026
Decision
Permit
Decision date
9 Sept 2026
Decision level
Committee Decision
Applicant
Show
Agent
CarneySweeney

How this decision compares

Decided in 138 days from validation, 69 days slower than Brecon Beacons's median of 69 for full applications. Approved, as 88% of full applications here are.

40%decided within 8 weeks
88%approved
5%go to committee

Plota live figures for full applications decided by Brecon Beacons in the last twelve months, from validation. Brecon Beacons decision record →

Public comments

1comment received
1 neutral

3 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
26 May 2026
Env. assessment
No