Biogas facility extension at Renescience Northwich, Lostock Gralam, Northwich
Summary of planning committee decision
Decided by Chester Planning Committee on 6 Oct 2026.
What was proposed
The application proposed expanding the anaerobic digestion facility, increasing organic waste capacity and converting biogas into biomethane and liquefied carbon dioxide.
“The Applicant has applied for the development of an extension to an existing anaerobic digestion (AD) facility. The site contains an existing AD facility which processed 144,000 tonnes per annum (tpa) of residual municipal waste and included pretreatment / processing facility (Reactor, sorting and loading halls) to produce biogas. The proposal would increase capacity from 144,000tpa to 177,000tpa of pre-processed liquid food/organic waste.”
“The site is currently being redeveloped in accordance with amendments approved under Non-mMaterial Amendment Applications and Demolition works which require the demolition of steel framed buildings, the Reactor Hall, Sorting Hall and Loading Hall (see relevant planning history below). This removes the pre-treatment element of the Renescience Waste Treatment Facility and the retention of the Anerobic Digestion component and the associated gas engines.”
Officer report
The site and surroundings
The 4.11-hectare site is an existing industrial waste-treatment and anaerobic digestion facility beside railway sidings and near homes, industry and waterways.
“The 4.11 hectare application site is off Griffiths Road, Lostock Gralam, approximately 2km east of Northwich town centre. It is sited within an industrial complex, on a Waste Treatment Facility (Renescience) since 2017, prior to which was a Chlorine manufacturing complex which operated up until 2001. The site includes a range of industrial scale buildings, tanks, structures and equipment that relate to the Waste Treatment Facility, an Anaerobic Digestion Facility.”
“To the east of the site is the Imery’s industrial plant and the main body of the industrial complex. To the south of the site is Wade Brook, along with a rail siding, conveyor structure and infrastructure from the former Tata chemical works, which ceased operation in early 2025. Further south is Griffiths Park, a former lime bed and landfill that has been redeveloped into a park / recreation area.”
Officer report
Earlier permissions
Earlier permissions covered the sustainable waste treatment facility, layout changes, extensions, non-material amendments and demolition works.
“Application Number: 25/00687/NMA – Non Material Amendment to 16/01436/S73 (Amendment to the internal general arrangement of the Digestate Treatment Building, amendments to the anaerobic digestion (AD) facility comprising the installation of replacement heat exchanger, installation of new pipework and short section of new pipe bridge and amendment to the wording of condition 27 relating to the Odour Management Plan) - Granted 2.4.2025”
“Application Number: 16/01436/S73 - Variation of condition numbers 2, 3, 10, 19 and 29 of planning permission 15/04133/FUL to allow minor material changes to the site layout to improve efficiency of the facility – Granted 12.7.2016”
Officer report
What officers recommended
Officers recommended permission because the proposal supported renewable energy, energy security and the transition to net zero, with impacts controlled by conditions.
“The site is safeguarded for waste management purposes, and the proposal is supported in principle by the development plan policies relating to waste management and renewable and low-carbon energy. Substantial weight is given to the benefits of improving energy security, supporting economic development and contributing towards the transition to a net zero future, in accordance with Policy W3 of the NPPF.”
“Planning permission is therefore recommended, subject to the conditions set out below.”
Officer report
What consultees said
Consultees raised no objections subject to conditions covering drainage, highways, odour, noise, ecology, contamination, construction and landscaping.
“Environmental Protection: No objection subject to conditions, 1. Waste Delivery hours, 2, Hours of construction / demolition, 3, Construction Delivery hours, 4. Odour Management Plan, 5. External lighting scheme, 5. Scheme for the control of noise from the site.”
“Contaminated Land: No objection subject to conditions: 1. Scheme to deal with risks associated with actual or potential contamination of the site, 2. Land Contamination Verification Report in line with Remediation Strategy, 3. Unexpected contamination to address any contamination which has not been previously identified.”
Officer report
What people said
Parish councils and residents raised concerns about odour, traffic, noise, emissions, flaring, pollution and effects on the surrounding environment.
“Rudheath Parish Council – Concerns regarding odour; unloading of liquid waste and how this can be undertaken safely without spillages; ensure HGV movements are capped and controlled; impact of gas flare on surrounding area; noise impact…”
“Lostock Gralam Parish Council – Concerns regarding: 1. Odour and the need for strong odour controls and monitoring; 2. Flare and Environmental Impact with possible noise, light and emissions when the flare is used; 3. HGV Movements and Traffic and potential increase.”
Officer report
Who spoke
The agent spoke about the application.
Members’ questions
Members questioned the HGV cap, delivery routes and operational noise, and officers confirmed existing controls and proposed conditions.
“Citing the report, members requested clarity as the number proposed HGV movements was reported to not be increasing, yet the number operations on site would increase suggesting an increase in HGV movements.. Officers clarified that the current HGV movement cap limit would be maintained and the site would operate within the existing HGV cap. .”
“Clarification was also sought from members regarding operational noise from the site. Officers confirmed that a condition would be imposed to ensure that the operational noise from the site inclusive of mitigation would not exceed the background sound levels.”
Minutes
The vote
Members unanimously accepted the application subject to the conditions in the report.
“A proposal to accept the application subject to conditions within the report was passed unanimously.”
Minutes
Councillors at the meeting
- Gina LewisChairLabour
- Katrina KerrVice-ChairLabour
- Tommy BlackmoreLabour
- Chris CopemanGreen
- Razia DanielsConservative
- Olwyn DeanDeclared an interestLabour
- Gillian EdwardsIndependent
- Ben WalkerLabour
- Norman WrightConservative
- Michael GarveySubstituteLabour
- Patricia ParkesSubstituteConservative
Apologies Gaynor Sinar Conservative, Alex Tate Labour
Also attending Tom Cooper Conservative, Peter Wheeler Labour
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Chester Planning Committee minutes, 6 October 2026
- Agenda and papers (council website)
Source: Plota analysis of Chester's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Chester Planning Committee
- Council
- Chester
- Date
- Tuesday 6 October 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Councillors
- 11Labour 6Conservative 3Green 1Independent 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Chester committee decisions →
This committee's year
29 decisions in the 12 months to this meeting, 1 against officer advice.