106 Cae Perllan Road Newport South Wales NP20 3FT Data via plota.co.uk

26/0298 - Full Approved

Proposal

Proposed front extension to provide a ground floor toilet and shower room Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
27 Apr 2026
✓
Approved
3 Jun 2026

Approved on 3 Jun 2026 · Committee · Last checked 5 Jul 2026

Planning committee

Decided by Newport Planning Committee on 3 Jun 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The proposal was a front extension providing a ground-floor toilet and shower room.
  • The application came to committee because the applicant was a Newport City Councillor.
  • The application was granted with conditions.
Read how the committee decided The proposal, site, committee consideration and decision with conditions. Includes the meeting recording

Source: Plota analysis of Newport's committee minutes of 3 Jun 2026.

Site constraints 2

Also on the record
Registered park or garden about 147 m away: Newport: Nos 15 and 17 Stow Park Circle; Conservation area about 62 m away: Stow Park.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newport
Application type
Full
Postcode
NP20 3FT
Received
15 Apr 2026
Validated
27 Apr 2026
Ward
Gaer
Case officer
Show
Decision
Granted with Conditions
Decision date
3 Jun 2026
Decision level
Committee
Applicant
Show

How this decision compares

Decided in 37 days from validation, 15 days faster than Newport's median of 52 for extensions. Approved, as 79% of extensions here are.

61%decided within 8 weeks
79%approved
250decided in the last year

Plota live figures for extensions decided by Newport in the last twelve months, from validation. Newport decision record →

Consultation & key dates

Env. assessment
No