133 Park View, Hastings, TN34 2PE Data via plota.co.uk

HS/CD/26/00224 - Discharge of Conditions Approved

Proposal

Discharge of condition 3 (drainage layout) of Planning Permission HS/FA/25/00753 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Apr 2026
✓
Consultation
22 Apr 2026
✓
Approved
20 May 2026

Approved on 20 May 2026 · DELEGATED · Last checked 5 Jul 2026

Associated applications 2

Site constraints 4

Local nature reserve about 145 m away: Old Roar Gill & Coronation Wood
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Registered park or garden about 109 m away: Alexandra Park; Inside the Hastings built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £265,000 in July 2020. Detached house, freehold.

10 July 2020£265,000
30 June 1998£68,475

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area63 m² (678 sq ft)
Energy ratingD (59 out of 100), could reach B
PropertyDetached bungalow, 4 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in March 2020, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Hastings - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hastings
Application type
Discharge of Conditions
Postcode
TN34 2PE
Received
14 Apr 2026
Validated
14 Apr 2026
Ward
ST HELENS 2018
Case officer
Show
Target decision
9 Jun 2026
Decision
GRANTED PERMISSION
Decision date
20 May 2026
Decision level
DELEGATED
Applicant
Show
Agent
Pump House Designs

Consultation & key dates

Consultation
22 Apr 2026
Statutory expiry
9 Jun 2026
Hastings
Planning Authority Score
3.8/10
Below average
#206 of 296 councils
Relevant to this application:
Householder decisions

Hastings ranks #139 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hastings decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #172 of 296
90%
Householder approved
Above avg (90%) #190 of 296
67%
Decided in 8 weeks
Above avg (63%) #139 of 296
50%
Extended time limit
Above avg (41%) #224 of 296
73%
Minor dwellings approved
49 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
76%
Change of use approved
25 decided
338
Total decisions
44 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.