Drain From Bexwell To Bury St Edmunds 562498 303555 Norfolk Data via plota.co.uk
Description
DISCHARGE OF CONDITION 16 FROM PLANNING PERMISSION - Proposed hybrid for the proposed Bexwell to Bury St Edmunds Pipeline Scheme with full planning consent sought for a proposed 70 kilometre pipeline and associated above ground infrastructure at Gazeley, Isleham and Woodditton; and outline consent for above ground infrastructure at Bexwell, Kentford Ladys Green and Rede with all matters reserved except access Data via plota.co.uk
Last checked
Associated applications 2
Part of
Conditions 16 decided (outcome not recorded)
- ConditionsDISCHARGE OF CONDITION 16 FROMThis application21/01580/DISC_D
Site constraints 4
Show all 2 with distances
- 53 mBarn 110 Metres North of St Marys ChurchGrade II
- 138 mChurch of St Mary the VirginGrade II*
Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Kings Lynn - and every UK council - as a live feed, an API, or a bulk CSV export.
Historical activity at this location
8 nearby applications on record - archival context, not part of the live application.
Nearby activity
Kings Lynn is one of the fastest councils in England for householder decisions: #20 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Referenced application
Council archive
Drain From Bexwell To Bury St Edmunds 562498 303555 Norfolk
Proposed hybrid for the proposed Bexwell to Bury St Edmunds Pipeline Scheme with full planning consent sought for a proposed 70 kilometre pipeline and associated above ground infrastructure at Gazeley, Isleham and Woodditton; and outline consent for above ground infrastructure at Bexwell, Kentford Ladys Green and Rede with all matters reserved except access
- Received
- 4 Aug 2021
- Decided
- 4 Nov 2022
- Outcome
- Approved
