Access tracks and compounds at Land 350 Metres West Of Studio Cottage, Tummel Bridge, Pitlochry

Summary of planning committee decision

Decided by Perth Planning and Placemaking Committee on 14 Oct 2026.

26/00501/FLMApproved

What was proposed

The application proposed permanent and temporary access tracks, two temporary junctions, two construction compounds and associated works for underground cabling.

“7km of permanent stone access track; • 136m of temporary access track (north); • 107m of temporary access track (south), • 462m of existing track widening (north); • 406m of existing track widening (south); • Two temporary bellmouth junctions off the B846 public road; • A temporary laydown / construction compound (north) approximately 80m x 50m • A temporary laydown / construction compound (south) approximately 89m x 54m, and the reinstatement of temporary elements.”

“4 In addition, a small section of temporary stone access track is required to facilitate a temporary diversion of an existing access to a residential property (Tombreck Cottage) during the construction period. Two temporary bellmouth junctions are also required to facilitate construction traffic off the adjacent B846.”

Officer report

The site and surroundings

The site lies in open moorland near Tummel Bridge, with forestry, woodland, agricultural ground, existing electrical infrastructure and nearby heritage assets.

“2 The proposed access tracks and associated works will facilitate the installation of a double circuit 132 Kv underground cable (UGC) between the Errochty and Kinardochy substations, south of Tummel Bridge. The UGC work itself permitted development. The area is characterised by above-ground, electrical Infrastructure within otherwise: open moorland used primarily for rough grazing, commercial forestry plantation, native woodland planting and agricultural ground.”

“There are no core paths or statutory designations within the site boundary. In terms of archaeology and cultural heritage, the main asset is the Tom Beithe Military Road (MPK 1783), a well-preserved example of a military road, with sections of road surface still exposed. Furthermore, the kiln associated with Tombreck Township (MPK8855) is located nearby.”

Officer report

Earlier planning history

Earlier permissions covered substations, a temporary compound and related infrastructure, while pre-application consultation addressed access tracks and construction compounds.

“24/00011/PAN - Submitted on 23.10.2024 for proposed access tracks, bellmouth junctions, a short section of temporary access track and two temporary construction compounds. Closed on 4.11.2024. The details of the proposed public consultation were considered acceptable.”

“25/00006/PREAPM - Pre-Application advice was sought and provided (15/05/2026) in relation to the development of a permanent stone access track to facilitate the installation of a 132 kV underground cable. Also, ancillary infrastructure required during the construction: two temporary bellmouth junctions, two temporary construction compounds and a small section of temporary stone access track, at Land 350m west of Studio Cottage, Tummel Bridge, Pitlochry.”

Officer report

Why officers supported it

Officers considered the works necessary for transmission infrastructure supporting renewable energy and acceptable on landscape, access, drainage, heritage and biodiversity grounds subject to conditions.

“40 The proposal is for temporary and permanent access tracks, and associated works, between the existing Errochty substation and the new Kinardochy substation. The wider substation proposals related to Scottish and UK Government Net Zero climate change targets which see significant increases in renewable generation, requiring greater capacity across the UK grid.”

“51 The area also sees existing transmission infrastructure, i.e. overhead lines, substations and associated tracks, which are significant components of the existing landscape. The choice of route and design for the proposed access tracks has been developed such that their length and impact are minimised. Furthermore, the proposed tracks are similar in form to existing access tracks, associated with other infrastructure in the surrounding landscape.”

Officer report

The decision

“Resolved: Grant, subject to the following terms, amended conditions, additional condition requested by members and informatives: Conditions General 1. This planning permission will last only for three years from the date of this decision notice, unless the development has been lawfully started within that period. Reason - This is a Planning Permission in terms of Section 58 of the Town and Country Planning (Scotland) Act 1997, as amended by Section 32 of the Planning (Scotland) Act”

Minutes, 14 Oct 2026

Councillors at the meeting

Apologies Dave Cuthbert Independent, Richard Watters SNP

Source: Plota analysis of the council's minutes; parties from Democracy Club.

Sources

  • Perth Planning and Placemaking Committee minutes, 14 October 2026
  • Agenda and papers (council website)

Source: Plota analysis of Perth's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Perth
Date
Wednesday 14 October 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Councillors
9Conservative 4SNP 4Lib Dem 1Show councillors
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

65 decisions in the 12 months to this meeting, 7 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →