26/00582/PFUL3 - Full planning application Approved

Proposal

Proposed works to the east of the site, rear of Dundee House, consisting of the dismantling and removal of the existing GRP pod, and replaced with a new insulated brick outer leaf with a lean-to roof Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Consultation
23 Apr 2026
✓
Approved
11 Jun 2026

Approved on 11 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 4

Air quality management area: AQMA No.2
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m of the postcode pin; Local nature reserve about 477 m away: Hucknall Road Linear Walkway; Inside the Nottingham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Nottingham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Nottingham
Application type
Full planning application
Postcode
NG5 1PB
Received
15 Apr 2026
Validated
15 Apr 2026
Ward
Sherwood (May 2019)
Case officer
Show
Target decision
10 Jun 2026
Decision
Grant conditional permission
Decision date
11 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
P+HS Architects

How this decision compares

Decided in 57 days from validation, about the council's usual 56 days. Approved, as 95% of extensions here are.

59%decided within 8 weeks
95%approved
346decided in the last year

Plota live figures for extensions decided by Nottingham in the last twelve months, from validation. Nottingham decision record →

Consultation & key dates

Alt. reference
PP-14853168
Consultation
23 Apr 2026
Comments by
24 Apr 2026
Site or press notice
23 Apr 2026
Env. assessment
No
Nottingham
Planning Authority Score
4.1/10
Below average
#191 of 296 councils
Relevant to this application:
Householder decisions

Nottingham is slower than most councils at deciding householder applications, ranking #255 out of 296. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Nottingham decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #139 of 296
90%
Householder approved
Above avg (90%) #193 of 296
45%
Decided in 8 weeks
Below avg (63%) #255 of 296
33%
Extended time limit
Below avg (41%) #79 of 296
80%
Minor dwellings approved
44 decided (1-9 homes)
95%
Major dwellings approved
21 decided (10+ homes)
82%
Change of use approved
99 decided
1,044
Total decisions
116 refused in the year to March 2026