Beauchief Abbey Beauchief Abbey Lane Sheffield S8 7BD Data via plota.co.uk

26/01850/FUL - Full Planning Application Refused

Proposal

Erection of new accessible toilet and adjacent store including associated hard standing, service connection and drainage works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jun 2026
✓
Validated
25 Jun 2026
✓
Consultation
25 Jun 2026
✗
Refused
20 Aug 2026
Appeal
Not lodged

Refused on 20 Aug 2026 · Delegated decision · Last checked 19 Nov 2026

Site constraints 11

Scheduled monument: Beauchief Abbey Premonstratensian monastery: inner precinct and three fishponds
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade II* listed: Church of St Thomas A Becket and Remains of Beauchief Abbey Church
List entry 1271291 · 1 m away · 3 more listed buildings within 150 m (3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 3 with distances
Historic England ↗
Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Beauchief Abbey conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Sheffield Citywide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 274 m away: Totley Wood SSSI; Radon affected area, class 4; Coalfield, development low risk area; Inside the Sheffield built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sheffield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sheffield
Application type
Full Planning Application
Postcode
S8 7BD
Received
22 Jun 2026
Validated
25 Jun 2026
Ward
Beauchief & Greenhill
Case officer
Show
Target decision
20 Aug 2026
Decision
Refuse
Decision date
20 Aug 2026
Decision level
Delegated decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, 15 days faster than Sheffield's median of 71 for commercial and major works. Refused, as 7% of commercial and major works here are.

40%decided within 8 weeks
93%approved
112decided in the last year

Plota live figures for commercial and major works decided by Sheffield in the last twelve months, from validation. Sheffield decision record →

Public comments

2comments received
1 objecting1 neutral

4 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15018612
Planning Portal ref
PP-15018612
Consultation
25 Jun 2026
Comments by
29 Jul 2026
Site or press notice
4 Jul 2026
Statutory expiry
20 Aug 2026
Env. assessment
No
Sheffield
Planning Authority Score
4.4/10
Below average
#183 of 296 overall
Relevant to this application:
Householder decisions

Sheffield is #176 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sheffield decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #178 of 296
89%
Householder approved
Below avg (90%) #209 of 296
61%
Decided in 8 weeks
Below avg (63%) #176 of 296
36%
Extended time limit
Below avg (41%) #114 of 296
71%
Minor dwellings approved
144 decided (1-9 homes)
85%
Major dwellings approved
33 decided (10+ homes)
87%
Change of use approved
124 decided
1,756
Total decisions
237 refused in the year to March 2026