25/01851/3FUL - Planning FULL (DMBC Reg3) Approved

Proposal

Erection of new pavilion following demolition of existing fire damaged pavilion Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2025
✓
Validated
28 Nov 2025
✓
Consultation
12 Feb 2026
✓
Approved
6 Mar 2026

Approved on 6 Mar 2026 · Delegated · Last checked 8 Oct 2026

Associated applications 2

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 765 m away: Tween Bridge Solar Farm
The site is 765 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Nature improvement area: Humberhead Levels; Coalfield, development low risk area; Inside the Moorends built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Planning FULL (DMBC Reg3)
Postcode
DN8 4NA
Received
18 Sept 2025
Validated
28 Nov 2025
Ward
Thorne And Moorends
Parish
Thorne Town Council
Case officer
Show
Target decision
6 Mar 2026
Decision
Planning Permission GRANTED
Decision date
6 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
Gilbert Elliot Rowe Ltd

How this decision compares

Decided in 98 days from validation, 44 days slower than Doncaster's median of 54 for full applications. Approved, as 88% of full applications here are.

64%decided within 8 weeks
88%approved
778decided in the last year

Plota live figures for full applications decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14333636
Planning Portal ref
PP-14333636
Consultation
12 Feb 2026
Comments by
5 Mar 2026
Statutory expiry
23 Jan 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 overall
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions: #27 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026