Dundonald International Ice Bowl (DIIB) (including the existing building and adjacent land within the Ice Bowl complex), 111 Old Dundonald Road, Dundonald, Belfast, BT16 1XT Data via plota.co.uk

Proposal

The proposed amendments comprise a combination of interim changes to enable an Operational Phase 1 of the development, together with a small number of permanent design adjustments. The interim proposals include the phased delivery of the adventure play, sensory rooms and healthcare facility, with their footprints temporarily treated through extended play surfacing and courtyard finishes. Associated temporary revisions to access, fire escape arrangements, façades, landscaping, civil works and drainage are proposed to allow the completed ice rink, bowling facility and gym to operate during this phase. Permanent amendments include a change to the approved external cladding material to perforated aluminium panels with the same decorative tree effect, and minor internal layout adjustments to suit operational requirements, with no change to the overall floorspace or external form of the building. Further detail is provided in the enclosed cover letter. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Apr 2026
Validated
20 Apr 2026
Decision
Expected by 15 Jun 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 13 Sept 2026; it is now day 146.

Documents 17

All documents on the council site ↗

Work with planning data?

Every application in Lisburn and Castlereagh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non Material Change
Postcode
BT16 1XT
Received
17 Apr 2026
Validated
20 Apr 2026
Ward
Ballyhanwood
Applicant
Show
Agent
AECOM

Decision outlook

Day 146, past the statutory target. 54% of amendments in Lisburn and Castlereagh are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 5 Sept 2026.

Day 14690 days past the 56-day target
31%decided within 8 weeks
85%approved
17decided in the last year

Plota live figures for amendments decided by Lisburn and Castlereagh in the last twelve months, from validation. Lisburn and Castlereagh decision record →

Consultation & key dates

Planning Portal ref
PP-14620831