Opp 65-67 Linnards Lane Wincham Northwich CW9 6ED, OS 50-52 Green Lane Wincham Northwich CW9 6EH, OS 60-62… Data via plota.co.uk

26/01183/DSM - DSLAM/Antenna Notification Approved

Proposal

Install fixed line broadband electronic communications apparatus. Ref: WH1HLM6W Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Apr 2026
✓
Approved
14 Apr 2026

Approved on 14 Apr 2026 · Last checked 22 Jul 2026

Site constraints 5

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1732 m away: Keuper Gas Storage Project; Inside the Pickmere built-up area; Green belt about 62 m away: Merseyside and Greater Manchester; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
DSLAM/Antenna Notification
Postcode
CW9 6ED
Received
13 Apr 2026
Validated
13 Apr 2026
Ward
Marbury
Parish
Wincham
Decision
Notification Closed
Decision date
14 Apr 2026
Applicant
Show

How this decision compares

Decided in 1 days from validation, about the council's usual 1 days. Approved, as 99% of utility and infrastructure works here are.

90%decided within 8 weeks
99%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Chester in the last twelve months, from validation. Chester decision record →

Consultation & key dates

Env. assessment
No