Telecommunication Site Verge at Junction of Steepdown Road Halewick Lane Sompting West Sussex Data via plota.co.uk

SDNP/26/01399/PNTEL - Prior Notification Telecoms (28 day) Approved

Proposal

Notification under the Electronic Communications Code Regulations of the Intention to Install Electronic Communications Apparatus at Existing Street Works Column Installation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Apr 2026
✓
Approved
6 May 2026

Approved on 6 May 2026 · SDNPA Delegated Decision · Last checked 5 Jul 2026

Site constraints 3

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National park about 6 m away: South Downs
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
National infrastructure project about 1.4 km away: Rampion Offshore Wind Farm.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Notification Telecoms (28 day)
Postcode
BN15 0LH
Received
9 Apr 2026
Validated
9 Apr 2026
Ward
Cokeham Ward
Parish
Sompting Parish Council
Case officer
Show
Target decision
7 May 2026
Decision
Raise No Objection
Decision date
6 May 2026
Decision level
SDNPA Delegated Decision
Applicant
Show

How this decision compares

Decided in 27 days from validation, 27 days faster than South Downs's median of 54 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

60%decided within 8 weeks
97%approved
127decided in the last year

Plota live figures for utility and infrastructure works decided by South Downs in the last twelve months, from validation. South Downs decision record →

Consultation & key dates

Statutory expiry
7 May 2026
Env. assessment
No