118 High Street Brant Broughton Lincoln Lincolnshire LN5 0SA Data via plota.co.uk

26/0460/LBC - Listed Building Consent Approved

Proposal

Regularisation of works carried out during the conversion that was not completed to the plans approved under Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Apr 2026
✓
Validated
13 Apr 2026
✓
Consultation
5 Jun 2026
✓
Approved
5 Jun 2026

Approved on 5 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 7

Brant Broughton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
3 listed buildings within 150 m
Nearest: Digby House, Grade II, 45 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Inside the Brant Broughton built-up area; National infrastructure project 548 m away: Leoda Solar Farm; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area342 m² (3,681 sq ft)
Energy ratingC (69 out of 100)
PropertySemi-detached house, 8 habitable rooms
Built2007 to 2011
HeatingBoiler and radiators, oil
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in April 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
LN5 0SA
Received
11 Apr 2026
Validated
13 Apr 2026
Parish
Brant Broughton & Stragglethorpe
Case officer
Show
Target decision
8 Jun 2026
Decision
Approved
Decision date
5 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
TOWN-PLANNING.CO.UK

How this decision compares

Decided in 53 days from validation, about the council's usual 56 days. Approved, as 100% of listed building works here are.

52%decided within 8 weeks
100%approved
74decided in the last year

Plota live figures for listed building works decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Consultation & key dates

Alt. reference
PP-14850265
Planning Portal ref
PP-14850265
Neighbours
5 Jun 2026
Consultation
5 Jun 2026
Comments by
5 Jun 2026
Site or press notice
26 Apr 2026
Statutory expiry
8 Jun 2026
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 overall
Relevant to this application:
Other decisions

North Kesteven is #117 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.