Wembley Park Masterplan - 15.87 hectares of land bound by Fulton Road, First Way, South Way, Wembley Park Boulevard, Empire Way, Rutherford Way, and bisected by Engineers Way and Olympic Way, Wembley Data via plota.co.uk

26/0932 - Non-material amendments Approved

Proposal

Non-material amendment to condition 6 (retail unit with a floorspace in excess of 2,000 square metres (Gross External Area)) of Variation of Conditions reference dated 15 January, 2026, for Variation of condition 4 (approved drawings), condition 5 (Class A5 uses), condition 7 (number of Student Accommodation rooms) and condition 52 (confirmatory condition) to allow Purpose Built Student Accommodation as a permitted use on Plot W10 and to increase the number of student accommodation rooms that may be delivered within the Wembley Park Masterplan of hybrid planning permission reference (dated 23 May 2024) for the development as described below: Hybrid planning application, accompanied by an Environmental Impact Assessment, for the redevelopment of the site including; - Full planning permission for erection of a 10-storey car park to the east of the Stadium comprising 1,816 car parking spaces of which 1,642 are for non-residential purposes, up to 82 coach parking spaces and associated infrastructure, landscaping and vehicular access. And Outline application for the demolition of existing buildings on site and the provision of new floorspace within a series of buildings comprising residential accommodation (Use Class C3), education, healthcare and community facilities (Use Class D1), hotel (Use Class C1), assembly and leisure (Use Class D2), student accommodation (Sui Generis), retail, financial and professional services and food and drink (Use classes A1-A4) and commercial (Use Class B1) uses. The development will also provide associated open space (including a new public park) and landscaping; internal plant, refuse, cycle stores, residential lobbies, circulation and other residential ancillary space; car and coach parking (including residential parking and non-residential parking) and cycle storage; pedestrian, cycle and vehicular accesses; associated highway works; and associated infrastructure including water attenuation tanks, an energy centre and the diversion of any utilities and services to accommodate the development. Subject to a Deed of Agreement dated 23 December 2016 under Section 106 of the Town and Country Planning Act 1990, as amended. This application is accompanied by an Environmental Impact Assessment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Apr 2026
Approved
5 Jun 2026

Approved on 5 Jun 2026 · Delegated Team Manager · Last checked 6 Jul 2026

Associated applications 4

  • Part of

    VariationApprovedcouncil archive

    Conditions , , , varied

Site constraints 4

Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wembley
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Brent built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Non-material amendments
Postcode
HA9 0HS
Received
13 Apr 2026
Validated
13 Apr 2026
Ward
Wembley Park
Case officer
Show
Decision
Permission Granted
Decision date
5 Jun 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
CarneySweeney Planning

Consultation & key dates

Alt. reference
PP-14822690
Comments by
12 May 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026