Wentbridge Hotel Great North Road Wentbridge Pontefract WF8 3JJ Data via plota.co.uk

25/02060/SUB01 - Discharge of Conditions Request Approved

Proposal

Discharge of condition 3 (Biodiversity Gain Plan), 4 (Tree Planting) and 6 (Tree protection Plan) from approved application . Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
10 Apr 2026
Consultation
19 May 2026
Approved
25 Jun 2026

Approved on 25 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3, 4, 6 discharged

    • ConditionsDischarge of condition 3 (Biodiversity Gain Plan), 4 (Tree Planting) and 6 (Tree protection…This application25/02060/SUB01

Site constraints 4

Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Air quality management area: A1 Aqma
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Discharge of Conditions Request
Postcode
WF8 3JJ
Received
10 Apr 2026
Validated
10 Apr 2026
Ward
Pontefract South
Parish
Wentbridge
Case officer
Show
Target decision
5 Jun 2026
Decision
Conditions Discharged
Decision date
25 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Boston Renewables

Consultation & key dates

Alt. reference
PP-14844773
Consultation
19 May 2026
Comments by
9 Jun 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026