Red House Farm Hacks Drove Baston Lincolnshire PE6 9PT Data via plota.co.uk

S26/0620 - Householder Approved

Proposal

Two storey extension to side of dwelling, single storey lean to extension to rear of property and Internal & external alterations to property Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Apr 2026
✓
Approved
11 Jun 2026

Approved on 11 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
PE6 9PT
Received
9 Apr 2026
Validated
9 Apr 2026
Ward
Casewick Ward
Parish
Baston Parish Council
Case officer
Show
Target decision
4 Jun 2026
Decision
Approved conditionally
Decision date
11 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Rick Smith Design Ltd

How this decision compares

Decided in 63 days from validation, about the council's usual 62 days. Approved, as 93% of extensions here are.

42%decided within 8 weeks
93%approved
327decided in the last year

Plota live figures for extensions decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Consultation & key dates

Alt. reference
PP-14821006
Planning Portal ref
PP-14821006
Comments by
20 May 2026
Statutory expiry
4 Jun 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026