Hesketh Bank Community Centre Rear Hall Station Road Hesketh Bank Preston Lancashire PR4 6SR Data via plota.co.uk

T/2026/0036/TPO - Works to Protected Trees Approved

Proposal

Removal and maintenance of various trees as per tree survey. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Apr 2026
✓
Approved
17 Apr 2026

Approved on 17 Apr 2026 · Last checked 5 Jul 2026

Site constraints 3

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Also on the record
National infrastructure project about 654 m away: East Irish Sea Transmission Project, at pre-application; Inside the Tarleton and Hesketh Bank built-up area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lancashire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Protected Trees
Postcode
PR4 6SR
Received
7 Apr 2026
Validated
7 Apr 2026
Ward
North Meols & Hesketh Bank Ward
Parish
Hesketh-with-Becconsall
Case officer
Show
Decision
Grant Consent Subject to Conditions (TP)
Decision date
17 Apr 2026
Applicant
Show

How this decision compares

Decided in 10 days from validation, 23 days faster than West Lancashire's median of 33 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

79%decided within 8 weeks
99%approved
151decided in the last year

Plota live figures for tree and landscaping works decided by West Lancashire in the last twelve months, from validation. West Lancashire decision record →

Consultation & key dates

Env. assessment
No
West Lancashire
Planning Authority Score
1.1/10
Poor
#291 of 296 councils
Relevant to this application:
Householder decisions

West Lancashire is slower than most councils at deciding householder applications, ranking #265 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. West Lancashire is also one of the strictest councils - it refuses more householder applications than almost any other, with only 85% approved vs 90% nationally.

One of the strictest councils
only 85% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
West Lancashire decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #253 of 296
85%
Householder approved
Below avg (90%) #252 of 296
41%
Decided in 8 weeks
Below avg (63%) #265 of 296
60%
Extended time limit
Above avg (41%) #271 of 296
73%
Minor dwellings approved
62 decided (1-9 homes)
60%
Major dwellings approved
5 decided (10+ homes)
59%
Change of use approved
34 decided
564
Total decisions
103 refused in the year to March 2026