Land Off Skegness Road Partney Lincolnshire PE23 4PY Data via plota.co.uk

00516/26/FUL - Full Planning Permission Approved

Proposal

Planning Permission - Erection of 1 no. dwelling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Mar 2026
✓
Consultation
15 Apr 2026
✓
Approved
29 May 2026

Approved on 29 May 2026 · Last checked 5 Jul 2026

Site constraints 3

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National landscape 387 m away: Lincolnshire Wolds.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE23 4PY
Received
30 Mar 2026
Validated
30 Mar 2026
Ward
Hagworthingham Ward
Parish
Partney
Case officer
Show
Target decision
25 May 2026
Decision
Approved
Decision date
29 May 2026
Applicant
Show
Agent
R. Cartwright,

How this decision compares

Decided in 60 days from validation, about the council's usual 60 days. Approved, as 87% of new homes here are.

44%decided within 8 weeks
87%approved
88decided in the last year

Plota live figures for new homes decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Consultation & key dates

Neighbours
14 Apr 2026
Consultation
15 Apr 2026
Comments by
20 May 2026
Site or press notice
29 Apr 2026
Statutory expiry
25 May 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026