73 High Street, Burnham On Sea, Somerset, TA8 1PD Data via plota.co.uk

11/26/00020 - Full Planning Permission Approved

Proposal

Installation of replacement windows and reinstatement of building frontage following removal of ATM. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Mar 2026
✓
Approved
19 Aug 2026

Approved on 19 Aug 2026 · Last checked 19 Sept 2026

Planning committee

Decided by Sedgemoor North on 11 Aug 2026.

Approved by 9 votes to 1

Against officer advice, as the minutes record.

No officer report was published for this decision; this summary is from the committee minutes.

  • The application was to install replacement windows and reinstate the building frontage following removal of a cash machine.
  • Councillors debated whether heritage-style uPVC windows could replace timber at much lower cost, while officers maintained that timber better preserved the heritage asset.
  • The committee voted 9 to 1 to grant conditional permission for uPVC-style replacement windows, against the officer recommendation, adding a condition on submission of window details.
Read how the committee decided The debate on window materials and cost, and the committee's decision against officers.

Source: Plota analysis of Sedgemoor's committee minutes of 11 Aug 2026.

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special area of conservation about 112 m away: Severn Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 112 m away: Bridgwater Bay SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Conservation area about 7 m away: Burnham-on-Sea
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Burnham-on-Sea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Full Planning Permission
Postcode
TA8 1PD
Received
16 Mar 2026
Validated
16 Mar 2026
Parish
Burnham & Highbridge
Case officer
Show
Decision
Granted Permission
Decision date
19 Aug 2026
Applicant
Show
Agent
APW Planning Consultants, 30 Maxwell Street

How this decision compares

Decided in 156 days from validation, 112 days slower than Sedgemoor's median of 44 for extensions. Approved, as 95% of extensions here are.

79%decided within 8 weeks
95%approved
273decided in the last year

Plota live figures for extensions decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
3 Aug 2026
Comments by
22 Apr 2026