Land East of 11 To 37 Elm High Road Emneth Norfolk Data via plota.co.uk

23/01950/DISC_D - Discharge of Planning condition_D Decided

Proposal

DISCHARGE OF CONDITION 4 FOR PLOTS 14, 42, 43,45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56. 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69. 70, N6, N7, N8, N9 AND N10 ONLY FROM PLANNING PERMISSION - Variation of condition 1 and 9 of planning consent ; RESERVED MATTERS: For construction of dwellings. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Nov 2025
✓
Validated
1 Dec 2025
✓
Consultation
1 Dec 2025
✓
Discharge of Condition final letter
2 Feb 2026

Discharge of Condition final letter on 2 Feb 2026 · Discharge of Condition · Last checked 12 Oct 2026

Associated applications 3

  • Part of

    Reserved mattersApprovedcouncil archive

    Conditions , varied

    • Variationarchive

      Conditions 4 decided (outcome not recorded)

      • ConditionsDISCHARGE OF CONDITION 4 FOR PLOTS 14, 42, 43,45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56.…This application23/01950/DISC_D

Site constraints 4

National infrastructure project about 288 m away: Medworth Energy from Waste Combined Heat and Power Facility
The site is about 288 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Wisbech built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kings Lynn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Kings Lynn
Application type
Discharge of Planning condition_D
Received
28 Nov 2025
Validated
1 Dec 2025
Ward
Emneth And Outwell
Parish
Emneth
Case officer
Show
Target decision
19 Feb 2026
Decision
Discharge of Condition final letter
Decision date
2 Feb 2026
Decision level
Discharge of Condition
Applicant
Show
Agent
Ian H Bix Associates Ltd

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14527520
Planning Portal ref
PP-14527520
Consultation
1 Dec 2025
Comments by
22 Dec 2025
Statutory expiry
26 Jan 2026
Env. assessment
No
Kings Lynn
Planning Authority Score
8.4/10
Excellent
#17 of 296 overall
Relevant to this application:
Householder decisions

Kings Lynn is one of the fastest councils in England for householder decisions: #20 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Kings Lynn decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #133 of 296
95%
Householder approved
Above avg (90%) #82 of 296
87%
Decided in 8 weeks
Above avg (63%) #20 of 296
27%
Extended time limit
Below avg (41%) #41 of 296
76%
Minor dwellings approved
261 decided (1-9 homes)
85%
Major dwellings approved
26 decided (10+ homes)
89%
Change of use approved
44 decided
1,216
Total decisions
131 refused in the year to March 2026