52 Par Green Par Cornwall PL24 2AF Data via plota.co.uk

PA26/01970 - Full application Approved

Proposal

Single storey rear addition (detached garage to be removed). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Apr 2026
✓
Consultation
7 Apr 2026
✓
Approved
27 May 2026

Approved on 27 May 2026 · Peer Sign Off · Last checked 8 Jul 2026

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Local nature reserve about 213 m away: Par Beach and St Andrews Road
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
St. Mawes to Cremyll about 21 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
Nature recovery project: G7 Legacy; Inside the Tywardreath built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL24 2AF
Received
7 Apr 2026
Validated
7 Apr 2026
Ward
Fowey, Tywardreath And Par
Parish
Tywardreath And Par
Case officer
Show
Target decision
2 Jun 2026
Decision
Approved with conditions
Decision date
27 May 2026
Decision level
Peer Sign Off
Applicant
Show

How this decision compares

Decided in 50 days from validation, 4 days faster than Cornwall's median of 54 for demolitions. Approved, as 95% of demolitions here are.

78%decided within 8 weeks
95%approved
374decided in the last year

Plota live figures for demolitions decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Consultation & key dates

Alt. reference
PP-14787556
Planning Portal ref
PP-14787556
Neighbours
7 Apr 2026
Consultation
7 Apr 2026
Comments by
14 May 2026
Site or press notice
23 Apr 2026
Statutory expiry
2 Jun 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026