Land Field Head Road Laceby North East Lincolnshire DN37 7SS Data via plota.co.uk

DM/0205/26/CND - Discharge Condition Approved

Proposal

Details in Discharge of Condition 4 (Materials) pursuant to Appeals APP/ and APP/ of and Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Mar 2026
✓
Consultation
27 Mar 2026
✓
Validated
28 Aug 2026
✓
Approved
11 Sept 2026

Approved on 11 Sept 2026 · Delegated Decision · Last checked 12 Sept 2026

Associated applications 3

Site constraints 2

Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
National infrastructure project 810 m away: Viking CCS Pipeline
The site is 810 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project Two (decided, 1195 m); Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 1195 m); Grimsby to Walpole (at pre-application, 1324 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, 1763 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Condition
Postcode
DN37 7SS
Received
20 Mar 2026
Validated
28 Aug 2026
Ward
Wold
Parish
Laceby Parish Council
Case officer
Show
Target decision
23 Oct 2026
Decision
Conditions Complied With
Decision date
11 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14780976
Planning Portal ref
PP-14780976
Consultation
27 Mar 2026
Comments by
20 Apr 2026
Statutory expiry
23 Oct 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026