97 - 99 Broadway Leigh-on-sea Essex Data via plota.co.uk

26/00280/FUL - Full Application Approved

Proposal

Replacement timber windows and doors to 97 and 99 The Broadway, Replacement slate roof tiles to 97 The Broadway Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Mar 2026
✓
Validated
31 Mar 2026
✓
Approved
15 Jul 2026

Approved on 15 Jul 2026 · Delegated Decision · Last checked 16 Jul 2026

Site constraints 4

Leigh Cliff Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National nature reserve about 315 m away: Benfleet and Southend Marshes
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI about 315 m away: Benfleet and Southend Marshes SSSI; Inside the Southend-on-Sea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southend - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southend
Application type
Full Application
Postcode
SS9 1PG
Received
3 Mar 2026
Validated
31 Mar 2026
Ward
Leigh
Parish
Leigh Town Council
Case officer
Show
Target decision
26 May 2026
Decision
Grant Conditional Permission
Decision date
15 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Stone Me Ltd

How this decision compares

Decided in 106 days from validation, 50 days slower than Southend's median of 56 for extensions. Approved, as 86% of extensions here are.

74%decided within 8 weeks
86%approved
534decided in the last year

Plota live figures for extensions decided by Southend in the last twelve months, from validation. Southend decision record →

Consultation & key dates

Statutory expiry
26 May 2026
Env. assessment
No
Southend
Planning Authority Score
3.8/10
Below average
#209 of 296 councils
Relevant to this application:
Householder decisions

Southend ranks #155 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southend decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #261 of 296
88%
Householder approved
Below avg (90%) #224 of 296
64%
Decided in 8 weeks
Above avg (63%) #155 of 296
43%
Extended time limit
Above avg (41%) #173 of 296
62%
Minor dwellings approved
109 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
56%
Change of use approved
82 decided
904
Total decisions
177 refused in the year to March 2026