Two-storey data centre at 1 And 2 St Annes Boulevard, Redhill

Summary of planning committee decision

Decided by Reigate Planning Committee on 22 Apr 2026.

25/02312/FApproved

What was proposed

The application proposed demolishing two units and building a two-storey data centre with four data halls, offices, plant, parking and landscaping.

“This is a full application for the demolition of units 1 and 2 and construction of a single two-storey data centre building featuring three built elements accommodating four symmetrical Data Halls (each with an IT capacity of 3.6 MW), two on each floor, with an office block sited between the two data hall wings. The office block will consolidate reception, security, control rooms and support areas for the wider campus hub.”

“The generators would be sited externally and to the rear of the building at ground floor level. Above which and located on the gantry would be up to 13 LV Pods for electrical distribution to the data halls. Mechanical plant will be located at roof level to all 3 blocks. Rooftop plant would comprise 12 air cooled chillers set back from the principal façade and surrounded in an acoustically treated open top enclosure.”

Officer report

The site and surroundings

The site contains three data-centre buildings in an industrial estate beside residential areas, railway embankments and greenbelt land.

“The wider site occupies an area of approximately 3.1 hectares and comprises a set of three separate buildings (Units 1 to 3) with associated plant and parking located, occupied by Redhill Data Centres, at Foxboro Business Park in Redhill. Units 1 to 3 consist of single storey industrial warehouses with two storey office buildings adjoining at the front of each unit.”

“Holmethorpe Industrial Estate is located to the north and east of the Site. To the east and west is a railway embankment with mainline connection to Central London. The Greenbelt is located on the opposite side of the railway embankment to the east, which includes a set of lagoons and marshes of the Holmethorpe Sandpits Complex Site of Nature Conservation Importance (SNCI). The Patteson Court Landfill Site is located to the southeast within the greenbelt and SNCI.”

Officer report

Earlier planning history

Earlier permissions covered extensions, data-centre use, power infrastructure, warehouse development and related works across the three units.

“Granted May 2012 3.3 12/01392/F Electricity power infrastructure upgrade including installation of a high voltage substation, low voltage substation, 4 no generators for backup power only with associated fuel tank, 4 no containerised uninterrupted power supply units and 2 no containerised electric cabinets along with associated profiled sheet enclosure, within the external service area ancillary to unit 1, St Anne's Boulevard, Redhill.”

“Approved 07/08/2000 3.6 09/00766/F Conversion of warehouse and office for data centre use and associated works (within Use Classes B1 and Granted August 2009”

Officer report

What officers recommended

Officers recommended approval because the proposal would provide suitable employment floorspace and, with conditions, acceptable design, amenity, environmental and highway impacts.

“The proposal to rebuild and upgrade the existing data centres at unit 1 and unit 2 with one two-storey data centre complies with EMP1: Principal Employment Areas because it constitutes the development of upgraded floorspace within an established employment use. Both units already hold lawful planning permission for data centre use. Unit 1 was approved under application 07/00181/F, which permitted an extension to the existing facility.”

“DMP Policy EMP1 states that ‘planning permission will be granted... for the development of new, upgraded or extended floorspace’ within principal employment areas, including uses such as offices, industrial, and storage and distribution. The data centre represents an existing lawful employment use within a designated employment area.”

Officer report

What residents said

Nine responses raised concerns about parking, need, construction disruption, character, overdevelopment, noise, highways, privacy, health, flooding and alternative proposals; some expressed support.

“Issue Response Inadequate parking See paragraph 6.39 No need for the development See paragraph 6.4 Inconvenience during construction See paragraphs 6.59-6.64 Out of character with surrounding area See paragraphs 4.7 and 6.10 Overdevelopment See paragraph 6.11 Noise & disturbance See paragraphs 6.21-6.24 Hazard to highway safety See paragraph 6.39 Overlooking and loss of privacy See paragraph 6.20 Overshadowing See paragraph 6.19 Health fears See paragraph 6.29 Flooding See…”

“This is not a material planning consideration. Support - Community/regeneration benefit This is noted. Support - Economic growth / jobs…”

Officer report

What members debated

Members discussed construction traffic, height and visual impact, waste heat, energy demand, parking, lighting, noise, heat effects and climbing plants.

“Councillor Essex, a visiting member, stated that he had concerns relating to construction traffic, visual impact, district heating opportunities, and energy demand associated with the proposed development.”

“Concerns were raised about construction vehicle access, with a preference for routing all traffic through the Holmethorpe Industrial Estate to minimise disruption to residents. Clarification was sought on the true height of the proposed building, including roof plant, and whether the visual impact assessment had fully accounted for the increased massing, particularly for residents in nearby upper-floor flats.”

Minutes

The committee vote

The committee resolved to grant planning permission subject to the recommendation and addendum, with amendments to conditions 14 and 25.

“RESOLVED that planning permission be GRANTED subject to conditions as per the recommendation and addendum with amendment to conditions 14 and 25.”

“Condition 25 - No development shall be commenced until a feasibility study for the export of excess heat from the data centre hereby permitted to the adjacent Park 25 heat network has been undertaken and submitted to the local planning authority for approval.”

Minutes

Sources

  • Reigate Planning Committee minutes, 22 April 2026
  • Agenda and papers (council website)

Source: Plota analysis of Reigate's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Reigate
Date
Wednesday 22 April 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

24 decisions in the 12 months to this meeting, 1 against officer advice.

Source: Plota analysis of the committee's minutes.