Unit A2, Old Brighton Road, Langley Green, Crawley Data via plota.co.uk

CR/2025/0179/FUL - Full Planning Application Approved

Proposal

Refurbishment (including external alterations) and extension to existing warehouse, reconfiguration of yard and parking areas, and associated works related to the continued use of the Site for Class B8 (Storage and Distribution), and / or Class B2 (General Industrial) and / or Class E(g)(iii) (Light Industrial) uses Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Mar 2025
✓
Approved
15 Sept 2025

Approved on 15 Sept 2025 · Delegated · Last checked 9 Nov 2026

Documents 39

All documents on the council site ↗

Site constraints 3

2 Article 4 directions
Parts of the Urban District of Dorking · Land in the County of Surrey. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project about 277 m away: Gatwick Airport Northern Runway
The site is about 277 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Crawley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Crawley
Application type
Full Planning Application
Received
31 Mar 2025
Validated
31 Mar 2025
Case officer
Show
Target decision
15 Sept 2025
Decision
PERMIT
Decision date
15 Sept 2025
Decision level
Delegated
Applicant
Show
Agent
Montagu Evans

How this decision compares

Decided in 168 days from validation, 84 days slower than Crawley's median of 84 for full applications. Approved, as 84% of full applications here are.

20%decided within 8 weeks
84%approved
200decided in the last year

Plota live figures for full applications decided by Crawley in the last twelve months, from validation. Crawley decision record →

Public comments

1comment received

29 neighbours consulted · Last counted 9 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
21 May 2025
Crawley
Planning Authority Score
0.5/10
Poor
#295 of 296 councils
Relevant to this application:
Householder decisions

Crawley is one of the slowest councils in England for householder decisions, ranking #288 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Crawley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Crawley decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #235 of 296
82%
Householder approved
Below avg (90%) #265 of 296
26%
Decided in 8 weeks
Below avg (63%) #288 of 296
73%
Extended time limit
Above avg (41%) #290 of 296
80%
Minor dwellings approved
5 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
78%
Change of use approved
18 decided
218
Total decisions
38 refused in the year to March 2026