27 Colet Gardens,London,Hammersmith And Fulham,W14 9DL Data via plota.co.uk

P/2026/00866/FUL - Full Planning Application Approved

Proposal

Erection of a single storey porch extension to front side of the main building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Mar 2026
✓
Validated
30 Mar 2026
✓
Approved
8 Jul 2026

Approved on 8 Jul 2026 · Last checked 21 Sept 2026

Planning committee

Decided by Hammersmith and Fulham Planning and Development Control Committee on 7 Jul 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the extension would have acceptable visual and residential amenity impacts.
  • Objectors raised concerns about design, precedent, height, privacy, light, noise and consultation, while seven letters supported the proposal.
  • The committee unanimously approved both recommendations and authorised planning permission subject to conditions.
Read how the committee decided The proposed extension, site history, officer assessment, objections, speakers, committee debate, vote and decision. Includes the meeting recording, from 2:00:20 where this application was taken

Source: Plota analysis of Hammersmith and Fulham's committee minutes of 7 Jul 2026.

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 137 m away: Thames Tideway Tunnel
The site is 137 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £629,000 in May 2022. Flat or maisonette, leasehold.

12 May 2022£629,000
7 October 1996£127,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area74 m² (797 sq ft)
Energy ratingD (64 out of 100), could reach C
PropertyEnd-terrace maisonette, 3 habitable rooms
Built1976 to 1982
HeatingCommunity scheme
WallsCavity wall, as built, partial insulation (assumed)

From the energy performance certificate lodged in January 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W14 9DL
Received
27 Mar 2026
Validated
30 Mar 2026
Ward
Avonmore
Case officer
Show
Decision
Application Approved
Decision date
8 Jul 2026
Applicant
Show

How this decision compares

Decided in 100 days from validation, 24 days slower than Hammersmith and Fulham's median of 76 for extensions. Approved, as 98% of extensions here are.

24%decided within 8 weeks
98%approved
509decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
14 Apr 2026
Comments by
12 May 2026
Statutory expiry
25 May 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.