East Anglia ONE North Offshore Wind Farm Data via plota.co.uk

SCC/0191/25/DoR/EA1N - Discharge of Requirements Approved

Proposal

Discharge of Requirement 41 (1) and (2) Operational Drainage Management Plan Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Dec 2025
✓
Validated
10 Dec 2025
✓
Approved
27 Mar 2026

Approved on 27 Mar 2026 · Last checked 19 Oct 2026

Documents 26

Statements & assessments 17

PDF Officer Delegated Summary - R41 Operational Drainage_.pdf ( kb) Document · 27 Mar 2026 View ↗ PDF EA2-ONS-CNS-PLN-IBR-000016_ONSS_OP_DrainageMP_Rev4.pdf ( kb) Document · 19 Mar 2026 View ↗ PDF EA2-ONS-CNS-PLN-IBR-000016_ONSS_OP_DrainageMP_Rev4_Tracked.pdf ( kb) Document · 19 Mar 2026 View ↗ PDF EA1N-ONS-CNS-PLN-IBR-000026_ONSS_OP_DrainageMP_Rev4.pdf ( kb) Document · 19 Mar 2026 View ↗ PDF EA2 Operational drainage App7 1of 2_redacted.pdf ( kb) Document · 19 Mar 2026 View ↗ PDF EA2 Operational drainage App7 P2 of 2.pdf ( kb) Document · 19 Mar 2026 View ↗ PDF EA2-ONS-CNS-PLN-IBR-000016_ONSS_OP_DrainageMP_Rev3(1).pdf ( kb) Document · 23 Feb 2026 View ↗ PDF EA1N-ONS-CNS-PLN-IBR-000026_ONSS_OP_DrainageMP_Rev3(1).pdf ( kb) Document · 23 Feb 2026 View ↗ PDF EA2-ONS-CNS-PLN-IBR-000016_ONSS_OP_DrainageMP_Rev3.pdf ( kb) Document · 20 Feb 2026 View ↗ PDF EA1N-ONS-CNS-PLN-IBR-000026_ONSS_OP_DrainageMP_Rev3.pdf ( kb) Document · 20 Feb 2026 View ↗ PDF Response from Energy Agency_redacted.pdf ( kb) Document · 12 Feb 2026 View ↗ PDF Response from Flood and Water_redacted.pdf ( kb) Document · 22 Jan 2026 View ↗ PDF Response from Ecology Suffolk County Council_redacted.pdf ( kb) Document · 9 Jan 2026 View ↗ PDF Operational Drainage Appendix 7 Part 1 of 3.pdf ( kb) Document · 10 Dec 2025 View ↗ PDF Operational Drainage Appendix 7 Part 2 of 3.pdf ( kb) Document · 10 Dec 2025 View ↗ PDF Operational Drainage Appendix 7 Part 3 of 3.pdf ( kb) Document · 10 Dec 2025 View ↗ PDF EA1N-ONS-CNS-PLN-IBR-000026_ONSS_OP_DrainageMP_Rev1.pdf ( kb) Document · 9 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 305 m away: Sea Link
The site is about 305 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: East Anglia ONE North Offshore Windfarm (decided, about 305 m); East Anglia TWO Offshore Windfarm (decided, about 305 m); The Sizewell C Project (decided, about 807 m); LionLink Interconnector (at pre-application, about 838 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
1 listed building within 150 m of the postcode pin; Flood defence about 37 m from the postcode pin (natural high ground, designed for a 1 in 4 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Suffolk County Council - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Requirements
Received
9 Dec 2025
Validated
10 Dec 2025
Parish
Friston CP
Case officer
Show
Decision
DOR - Fully Discharged
Decision date
27 Mar 2026
Applicant
Show
Agent
SLR Consulting Limited

How this decision compares

Decided in 107 days from validation, 53 days slower than Suffolk County Council's median of 54 for discharge of conditions. Approved, as 98% of discharge of conditions here are.

52%decided within 8 weeks
98%approved
101decided in the last year

Plota live figures for discharge of conditions decided by Suffolk County Council in the last twelve months, from validation. Suffolk County Council decision record →

Public comments

2comments received

Last counted 19 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
9 Jan 2026