17 And 19 Bridge Street East Linton East Lothian EH40 3AG Data via plota.co.uk

25/01458/P - Planning Permission Approved

Proposal

Installation of gas meter box and piping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Validated
7 Jan 2026
✓
Consultation
7 Jan 2026
✓
Approved
13 Feb 2026

Approved on 13 Feb 2026 · Scheme of Delegation Decision · Last checked 9 Sept 2026

Site constraints 2

Grade B listed: 17, 19 Bridge Street, East Linton
List entry LB26639 · 1 m away · 36 more listed buildings within 150 m (1 Grade A, 20 Grade B, 15 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 36 with distances
Historic Environment Scotland ↗
East Linton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lothian - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Postcode
EH40 3AG
Received
22 Dec 2025
Validated
7 Jan 2026
Ward
Dunbar
Parish
Dunpender Community Council
Case officer
Show
Target decision
6 Mar 2026
Decision
Granted Permission
Decision date
13 Feb 2026
Decision level
Scheme of Delegation Decision
Applicant
Show
Agent
Planning And Building Design Ltd

How this decision compares

Decided in 37 days from validation, 13 days faster than East Lothian's median of 50 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

74%decided within 8 weeks
97%approved
6%go to committee

Plota live figures for utility and infrastructure works decided by East Lothian in the last twelve months, from validation. East Lothian decision record →

Consultation & key dates

Neighbours
7 Jan 2026
Consultation
7 Jan 2026
Comments by
6 Feb 2026
Site or press notice
16 Jan 2026
Statutory expiry
6 Mar 2026
Env. assessment
No