Site Of Food Machinery 2000 Ltd Depot, Comfortable Place, Kingsmead, Bath, Data via plota.co.uk

26/03969/COND - Discharge of Condition Approved

Proposal

Discharge of conditions 9 (Material) and 10 (Sample Panel) of application (Variation of conditions 9 (Materials - Submission of Materials Schedule) and 29 (Plans List) of application ((Variation of conditions 24 (finished floor levels) and 30 (Plans list) of application (Erection of 25 flats with cycle storage and car parking, refuse store, footpath linkage, revised access arrangements, landscaping and associated works, following demolition of 2 x 2 bed flats and 180m2 of office space))) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Oct 2026
✓
Approved
16 Nov 2026

Approved on 16 Nov 2026 · Last checked 17 Nov 2026

Associated applications 6

  • Part of

    Fullcouncil archive

    Conditions variation sought for ,

Site constraints 5

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public footpath 26 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Radon affected area, class 2; 6 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Discharge of Condition
Received
12 Oct 2026
Validated
12 Oct 2026
Ward
Kingsmead
Case officer
Show
Target decision
7 Dec 2026
Decision
Condition Discharged/Obligation
Decision date
16 Nov 2026
Applicant
Show
Agent
O'Leary Goss Architects

Consultation & key dates

Planning Portal ref
PP-15291512
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 overall
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications: #236 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026