18A & 18B Bollo Bridge Road Acton W3 8AT Data via plota.co.uk

263278FUL - Full Application Pending Consideration

Proposal

Replacement of the existing single-glazed timber sash and casement windows with double-glazed uPVC sash and casement windows. The works also include the renewal of the main roof in natural slate, the secondary roof in artificial slate, and the replacement of all associated rainwater goods, fascias, soffits. Finally replacing the existing uPVC rear door to double glazed uPVC rear door. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2026
Decision
Expected by 27 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 13 Nov 2026; it is now day 57.

Comments are open until 13 Nov 2026

Comment on this application ↗

Documents 18

Plans & drawings 15

PDF LOCATIONPLAN Draw - Location Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 07 - PROPOSED FLOOR PLANS Draw - Prop Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 04-1 - EXISTING FLOOR PLANS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 03 - EXISTING 3D VIEWS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 06 - PROPOSED 3D VIEWS Draw - Prop Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 09-1 - EXISTING WINDOWS SCHEDULE Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 10 - PROPOSED DOOR AND WINDOWS SCHEDULE Draw - Prop Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 08 - PROPOSED ELEVATIONS Draw - Prop Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 07-1 - PROPOSED FLOOR PLANS Draw - Prop Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 05 - EXISTING ELEVATIONS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 04 - EXISTING FLOOR PLANS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 12 - EXISTING _ PROPOSED UPVC SASH WINDOWS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 11 - EXISTING _PROPOSED WINDOWS UPVC DETAI Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SHEET - 13 - EXISTING _ PROPOSED DOOR UPVC DETAILS Draw - Exist Layout Plan · 1 Sept 2026 View ↗ PDF 18 BOLLO BRIDGE ROAD W3 8AT - SITE PLAN Draw - Exist Site/Block Plan · 1 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 5

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 343 m away: Thames Tideway Tunnel
The site is 343 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 37 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W3 8AT
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
South Acton
Case officer
Show
Target decision
27 Oct 2026
Applicant
Show
Agent
Bluelime

Decision outlook

Day 57, past the statutory target. 91% of extensions in Ealing are decided within thirteen weeks, which runs to 1 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 5717 days to the predicted decision (day 74)
70%decided within 8 weeks
85%approved
1,490decided in the last year

Plota live figures for extensions decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15160778
Planning Portal ref
PP-15160778
Comments by
13 Nov 2026
Statutory expiry
27 Oct 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026