26/1415/OHL - Overhead Electricity Lines Registered

Proposal

Removal of sections of overhead line and install them underground, install 2 new terminal poles and reposition pole mounted transformer Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
Decision
Expected by 23 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 5 Jan 2027, from North Kesteven's recent utility and infrastructure works.

Site constraints 5

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public bridleway about 28 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Radon affected area, class 4; National infrastructure project about 1.4 km away: Leoda Solar Farm.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 16 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Electricity Lines
Received
11 Nov 2026
Validated
11 Nov 2026
Parish
Brant Broughton & Stragglethorpe
Case officer
Show
Target decision
23 Dec 2026
Applicant
Show

Decision outlook

Day 12 of the 56-day target. North Kesteven usually decides utility and infrastructure works by day 55.

Day 1244 days to the 56-day target
67%decided within 8 weeks
100%approved
37decided in the last year

Plota live figures for utility and infrastructure works decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
23 Dec 2026
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 overall
Relevant to this application:
Householder decisions

North Kesteven is #117 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026