Camelia Hotel 176 - 178 Eastern Esplanade Southend-on-sea Essex SS1 3AA Data via plota.co.uk

26/00953/FUL - Full Application Approved

Proposal

Convert second floor studio apartments into one two-bedroom apartment at 176 Eastern Esplanade (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jul 2026
✓
Validated
10 Aug 2026
✓
Approved
27 Oct 2026

Approved on 27 Oct 2026 · Delegated Decision · Last checked 27 Oct 2026

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ramsar wetland 52 m away: Benfleet and Southend Marshes
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 52 m away: Benfleet and Southend Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Southend-on-Sea built-up area; Flood defence 39 m away (wall, designed for a 1 in 1000 year flood).
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southend - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southend
Application type
Full Application
Postcode
SS1 3AA
Received
20 Jul 2026
Validated
10 Aug 2026
Ward
Thorpe
Case officer
Show
Target decision
27 Oct 2026
Decision
Grant Conditional Permission
Decision date
27 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
ABG Architecture

How this decision compares

Decided in 78 days from validation, 22 days slower than Southend's median of 56 for extensions. Approved, as 85% of extensions here are.

72%decided within 8 weeks
85%approved
602decided in the last year

Plota live figures for extensions decided by Southend in the last twelve months, from validation. Southend decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
5 Oct 2026
Env. assessment
No
Southend
Planning Authority Score
3.8/10
Below average
#209 of 296 overall
Relevant to this application:
Householder decisions

Southend is #155 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southend decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #261 of 296
88%
Householder approved
Below avg (90%) #224 of 296
64%
Decided in 8 weeks
Above avg (63%) #155 of 296
43%
Extended time limit
Above avg (41%) #173 of 296
62%
Minor dwellings approved
109 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
56%
Change of use approved
82 decided
904
Total decisions
177 refused in the year to March 2026