Lodge Farm, Sandy Lane, Chicksands, Shefford, SG17 5QB Data via plota.co.uk
Proposal
Prior Approval for the Formation, Alteration or Maintenance of Private Ways for Agricultural or Forestry use: New road surfacing Data via plota.co.uk
Application progress
Approved on 21 Oct 2025 · Last checked 11 Oct 2026
Site constraints 4
Show all 4 with distances
- 0 mFirstlodge Farmhouse, Approximately 800 Metres North of Chicksands PrioryGrade II
- 7 mOutbuilding Immediately East of Firstlodge FarmhouseGrade II
- 40 mSecondlodge Farmhouse, Approximately 800 Metres North of Chicksands PrioryGrade II
- 67 mBarn Approximately 20 Metres South West of Secondlodge FarmhouseGrade II
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
- Council
- Central Bedfordshire
- Application type
- P.Notif. Agricultural Proposed Road
- Postcode
- SG17 5QB
- Received
- 2 Aug 2025
- Validated
- 26 Sept 2025
- Parish
- Campton/Chicksands, Southill
- Case officer
- Show
- Target decision
- 21 Nov 2025
- Decision
- Prior Approval Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )The applicant is advised that a banksman should be provided at all times during construction to escort any pedestrians using public footpath FPCH6 through the area and construction should stop whilst this is taking place. Banksman should also be aware of cyclists and horseriders using Campton and Chicksands Bridleway No. 4, and if construction vehicles are at work, they should be stopped to allow the public to pass along the bridleway safely.The applicant is advised that a banksman should be provided at all times during construction to escort any pedestrians using public footpath FPCH6 through the area and construction should stop whilst this is taking place. Banksman should also be aware of cyclists and horseriders using Campton and Chicksands Bridleway No. 4, and if construction vehicles are at work, they should be stopped to allow the public to pass along the bridleway safely. 2 )Details relating to Condition 2: Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK The SuDS Team will require calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. The SuDS Team will require full drainage drawings showing all connections, control features, storage, inverts etc. The SuDS Team will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753)Details relating to Condition 2: Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK The SuDS Team will require calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. The SuDS Team will require full drainage drawings showing all connections, control features, storage, inverts etc. The SuDS Team will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753)
- Decision date
- 21 Oct 2025
- Agent
- Show
How this decision compares
Decided in 25 days from validation, 13 days faster than Central Bedfordshire's median of 38 for prior approvals. Approved, as 85% of prior approvals here are.
Plota live figures for prior approvals decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →
Public comments
No public comments yet.
Last counted 11 Oct 2026
Consultation & key dates
- Consultation
- 26 Sept 2025
- Comments by
- 21 Oct 2025
- Site or press notice
- 2 Sept 2025
Historical activity at this location
16 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Central Bedfordshire is faster than most councils at deciding householder applications: #62 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Track this application
Lodge Farm, Sandy Lane, Chicksands, Shefford, SG17 5QB
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.