Lodge Farm, Sandy Lane, Chicksands, Shefford, SG17 5QB Data via plota.co.uk

CB/25/02706/PAAR - P.Notif. Agricultural Proposed Road Approved

Proposal

Prior Approval for the Formation, Alteration or Maintenance of Private Ways for Agricultural or Forestry use: New road surfacing Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Aug 2025
✓
Validated
26 Sept 2025
✓
Approved
21 Oct 2025

Approved on 21 Oct 2025 · Last checked 11 Oct 2026

Site constraints 4

4 listed buildings within 150 m of the postcode pin
Nearest: Firstlodge Farmhouse, Approximately 800 Metres North of Chicksands Priory, Grade II, the postcode pin is inside its outline · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Public bridleway about 19 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Inside the Chicksands built-up area; Priority habitat about 23 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
P.Notif. Agricultural Proposed Road
Postcode
SG17 5QB
Received
2 Aug 2025
Validated
26 Sept 2025
Parish
Campton/Chicksands, Southill
Case officer
Show
Target decision
21 Nov 2025
Decision
Prior Approval Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )The applicant is advised that a banksman should be provided at all times during construction to escort any pedestrians using public footpath FPCH6 through the area and construction should stop whilst this is taking place. Banksman should also be aware of cyclists and horseriders using Campton and Chicksands Bridleway No. 4, and if construction vehicles are at work, they should be stopped to allow the public to pass along the bridleway safely.The applicant is advised that a banksman should be provided at all times during construction to escort any pedestrians using public footpath FPCH6 through the area and construction should stop whilst this is taking place. Banksman should also be aware of cyclists and horseriders using Campton and Chicksands Bridleway No. 4, and if construction vehicles are at work, they should be stopped to allow the public to pass along the bridleway safely. 2 )Details relating to Condition 2: Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK The SuDS Team will require calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. The SuDS Team will require full drainage drawings showing all connections, control features, storage, inverts etc. The SuDS Team will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753)Details relating to Condition 2: Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK The SuDS Team will require calculations providing evidence of all surface water retained on site for the 1 in 100 (+40%CC). Any exceedance should be shown with pathways, depths and velocity. The SuDS Team will require full drainage drawings showing all connections, control features, storage, inverts etc. The SuDS Team will require BRE365 infiltration test results There should be a minimum 1m between the base of a soakage unit and the seasonal water table. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. The connection of private surface water drainage systems to a highway system is not permitted. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753)
Decision date
21 Oct 2025

How this decision compares

Decided in 25 days from validation, 13 days faster than Central Bedfordshire's median of 38 for prior approvals. Approved, as 85% of prior approvals here are.

90%decided within 8 weeks
85%approved
119decided in the last year

Plota live figures for prior approvals decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

No public comments yet.

Last counted 11 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
26 Sept 2025
Comments by
21 Oct 2025
Site or press notice
2 Sept 2025
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 overall
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications: #62 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026