11 Sid Lane Sidmouth Devon EX10 9AN Data via plota.co.uk

26/1615/LBC - Listed Building Consent Awaiting decision

Proposal

Replace 1no. window at ground floor and 1no. window at first floor on front (south) elevation; replace 1no. door on rear (north) elevation with stable door and patch render repair on front, rear & side (north, south & east) elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
Decision
Expected by 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from East Devon's recent extensions.

Site constraints 6

Grade II listed: 10-17, Sid Lane
List entry 1227826 · 1 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Sidmouth Sid Vale conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape 53 m away: East Devon
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
Radon affected area, class 4; Inside the Sidmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £310,000 in June 2021. Terraced house, freehold.

30 June 2021£310,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Listed Building Consent
Postcode
EX10 9AN
Received
20 Aug 2026
Validated
20 Aug 2026
Ward
Sidmouth Rural
Parish
Sidmouth
Applicant
Show
Agent
West Three Architects

Decision outlook

Day 50, past East Devon's usual 48 days for extensions. 91% are decided within thirteen weeks, so most likely by 19 Nov 2026.

Day 506 days to the 56-day target
74%decided within 8 weeks
95%approved
567decided in the last year

Plota live figures for extensions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

1comment received
1 neutral

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15150663
Planning Portal ref
PP-15150663
Site or press notice
28 Aug 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Other decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use