Stebondale Street, London, E14 3BX Data via plota.co.uk

PA/25/01649/NC - Full Planning Permission Approved

Proposal

Creation of a Synthetic Turf Pitch (STP) with associated features including spectator area, installation of goal storage, storage container, 4.5m high perimeter fencing, 2m high acoustic barrier, additional gate and LED floodlighting system. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 1 Oct 2025
✓
Consultation
21 Jan 2026
✓
Approved
23 Apr 2026

Approved on 23 Apr 2026 · Development Committee · Last checked 2 Nov 2026

Planning committee

Decided by Tower Hamlets Development Committee on 26 Feb 2026.

Approved

As officers recommended.

No officer report was published for this decision; this summary is from the committee minutes.

  • Officers found the noise and lighting impacts acceptable and recommended approval, with conditions limiting hours, capacity and music.
  • Objectors raised concerns about noise, parking and loss of open space, while supporters highlighted the lack of safe pitches for women and girls.
  • Members voted 3 to 1 to approve the application, in line with officers' recommendation.
Read how the committee decided The officers' assessment, objections and support, and the vote. Includes the meeting recording

Source: Plota analysis of Tower Hamlets's committee minutes of 26 Feb 2026.

Documents 31

All documents on the council site ↗

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve about 87 m away: Mudchute Park Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 214 m away: Thames Tideway Tunnel
The site is about 214 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 909 m); London Strategic Heat Main Project (at pre-application, about 830 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Inside the Tower Hamlets built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space about 29 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E14 3BX
Received
around 1 Oct 2025
Validated
1 Oct 2025
Ward
Island Gardens
Case officer
Show
Target decision
23 Apr 2026
Decision
Permit
Decision date
23 Apr 2026
Decision level
Development Committee
Applicant
Show
Agent
Labosport Ltd

How this decision compares

Decided in 204 days from validation, 148 days slower than Tower Hamlets's median of 56 for full applications. Approved, as 85% of full applications here are.

60%decided within 8 weeks
85%approved
557decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
21 Jan 2026
Consultation
21 Jan 2026
Comments by
11 Feb 2026
Site or press notice
14 Oct 2025
Committee
26 Feb 2026
Statutory expiry
26 Nov 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026