Killiewarren Tynron Thornhill DG3 4LD Data via plota.co.uk

26/1631/UTL - Utilities Consultation Decided

Proposal

Re-building of 11,000 voltage wood pole powerline to three phase Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 6 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 29 Oct 2026 and 12 Nov 2026, from Dumfries's recent utility and infrastructure works. The consultation period closed on 23 Sept 2026.

Site constraints 3

1 listed building within 150 m of the postcode pin
Nearest: Killiewarren, Grade B, about 10 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic Environment Scotland ↗
Also on the record
Special area of conservation about 330 m away: Upper Nithsdale Woods; SSSI about 330 m away: Stenhouse Wood.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 16 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dumfries - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dumfries
Application type
Utilities Consultation
Postcode
DG3 4LD
Received
11 Sept 2026
Validated
11 Sept 2026
Ward
Mid And Upper Nithsdale
Parish
Tynron Community Council
Applicant
Show

Decision outlook

Day 23 of the 56-day target. Dumfries usually decides utility and infrastructure works by day 57.

Day 2334 days to the predicted decision (day 57)
46%decided within 8 weeks
94%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Dumfries in the last twelve months, from validation. Dumfries decision record →

Public comments

No public comments yet.

Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
23 Sept 2026
Env. assessment
No