26/01322/FULL - Full Awaiting decision

Proposal

8 no. EV Chargers in existing hotel car park Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
20 Jul 2026
Decision
Expected by 13 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 14 Sept 2026; it is now day 56.

Site constraints 4

Grade II listed: Chapel of former Beaumont College
List entry 1119796 · 3 m from the pin · 2 more listed buildings within 150 m (2 Grade II*)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Bishopsgate built-up area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
SL4 2JJ
Received
20 Jul 2026
Validated
20 Jul 2026
Ward
Old Windsor
Parish
Old Windsor Parish
Target decision
13 Sept 2026
Applicant
Show

Decision outlook

Day 56, past Windsor and Maidenhead's usual 53 days for utility and infrastructure works. 94% are decided within thirteen weeks, so most likely by 19 Oct 2026.

Day 560 days to the 56-day target
73%decided within 8 weeks
58%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Windsor and Maidenhead in the last twelve months, from validation. Windsor and Maidenhead decision record →

Consultation & key dates

Alt. reference
PP-14966850
Statutory expiry
13 Sept 2026
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 councils
Relevant to this application:
Householder decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications, ranking #82 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026