B/25/0324 - Prior Approval-Ag to Dwelling House Approved

Proposal

Application under Class R, Part 3 of The Town and Country Planning (General Permitted Development) Order 2015 to change the use of agricultural shed to Class E(g)iii use (Industrial processes which can be carried out in a residential area without detriment to its amenity) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Aug 2025
✓
Consultation
17 Sept 2025
✓
Approved
14 Oct 2025

Approved on 14 Oct 2025 · Delegated Decision · Last checked 13 Oct 2026

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 354 m away: Triton Knoll Electrical System
The site is about 354 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, about 836 m); Grimsby to Walpole (at pre-application, about 859 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Prior Approval-Ag to Dwelling House
Postcode
PE20 3SR
Received
1 Aug 2025
Validated
1 Aug 2025
Ward
Swineshead And Holland Fen Ward
Parish
Holland Fen With Brothertoft
Case officer
Show
Target decision
26 Sept 2025
Decision
Approved
Decision date
14 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Guy Forman Architect Ltd

How this decision compares

Decided in 74 days from validation, 39 days slower than Boston's median of 35 for prior approvals. Approved, as 77% of prior approvals here are.

92%decided within 8 weeks
77%approved
26decided in the last year

Plota live figures for prior approvals decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

85 neighbours consulted · Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14166372
Planning Portal ref
PP-14166372
Neighbours
14 Oct 2025
Consultation
17 Sept 2025
Comments by
2 Oct 2025
Statutory expiry
26 Sept 2025
Env. assessment
No