Solar and renewables in Welwyn Hatfield

Welwyn Hatfield received 29 renewable energy applications in the last 12 months, including 3 battery storage sites and 8 heat pumps. Of the 22 decided so far, 20 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

13 last 90 days
|
2 last 30 days
|
0 last 14 days

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 13 of 13 applications
6/2026/1046/EM 16 Jun 2026 Pending

67 Newfields Welwyn Garden City AL8 6YS

Installation of solar panels to side facing roof and rear extension flat roof and EV charger to front of house

Welwyn Hatfield 16 Jun 2026
6/2026/1023/EM 10 Jun 2026 Pending

84 Attimore Road Welwyn Garden City AL8 6LP

Installation of 6 solar panels on a flat roof side extension with associated equipment installed to side of property

Welwyn Hatfield 10 Jun 2026
6/2026/0983/EM 3 Jun 2026 Pending

8 Beehive Green Welwyn Garden City AL7 4BE

Installation of solar panels and changes to fenestration

Welwyn Hatfield 3 Jun 2026
6/2026/0937/EM 28 May 2026 Pending

52 Woodland Rise Welwyn Garden City AL8 7LF

Installation of a solar PV array on the south, east & garage roofs of 52 Woodland Rise, consisting of a standard on-roof mounting system with 12 panel...

Welwyn Hatfield 28 May 2026
6/2026/0857/HOUSE 15 May 2026 Granted

15 Victoria Close Welwyn Garden City AL7 4EL

Installation of air source heat pump to front (south) facing elevation of dwelling

Welwyn Hatfield 15 May 2026
6/2026/0852/PN24 14 May 2026 Prior Approval Required and Granted

Tesco Stores Ltd Great North Road Hatfield AL9 5JY

Prior approval for a Solar PV installation to reduce electrical consumption and therefore carbon emissions at the commercial property

Welwyn Hatfield 14 May 2026
6/2026/0832/EM 12 May 2026 Pending

180 Heronswood Road Welwyn Garden City AL7 3EU

Install inline rooftop solar panels front and back (14 rear, 10 front), with back garden installations of backup battery and air source heat pump unit

Welwyn Hatfield 12 May 2026
6/2026/0732/EM 24 Apr 2026 Granted

3 Coneydale Welwyn Garden City AL8 7RX

Installation of solar panel on rear south-facing roof

Welwyn Hatfield 24 Apr 2026
6/2026/0727/HOUSE 24 Apr 2026 Refused

34 Northaw Road East Cuffley Potters Bar EN6 4LL

Erection of a single storey rear extension and front extension, part single storey, part two storey side extension, alterations to the roof including ...

Welwyn Hatfield 24 Apr 2026
6/2026/0716/EM 22 Apr 2026 Granted

15 Guessens Road Welwyn Garden City AL8 6QL

Erection of two storey rear extension, single storey side and rear extensions following demolition of existing garage, insertion of rooflights and ins...

Welwyn Hatfield 22 Apr 2026
6/2026/0680/HOUSE 16 Apr 2026 Granted

40 Brookside Crescent Cuffley Potters Bar EN6 4QN

Erection of two-storey front, side and rear extensions and alterations to the roof, including a crown roof to the rear, following partial demolition o...

Welwyn Hatfield 16 Apr 2026
6/2026/0630/EM 9 Apr 2026 Granted

56 Marley Road Welwyn Garden City AL7 4BS

Proposed installation of solar panels to rear roof of property

Welwyn Hatfield 9 Apr 2026
6/2026/0463/FULL 13 Mar 2026 Pending

Land West of Woolmer’s Park The Hay Barn (Howell Court Farm) Essendon AL9 5RL

Demolition of existing agricultural barn and erection of a replacement self-build dwellinghouse with associated access, parking, landscaping, installa...

Welwyn Hatfield 13 Mar 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Welwyn Hatfield

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Welwyn Hatfield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Welwyn Hatfield. You can also narrow the alert to a postcode, street, or drawn area.

We check Welwyn Hatfield's planning portal daily. New solar & renewables applications appear here within a day of being published.