Solar and renewables in Welwyn Hatfield

Welwyn Hatfield received 48 renewable energy applications in the last 12 months, including 6 battery storage sites and 15 heat pumps. Of the 34 decided so far, 32 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

17
|
3
|
1
Get alerts for Welwyn Hatfield

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 17 of 17 applications
1 Sept 2026 Under Consultation 6/2026/1526/HOUSE

32 Turpins Chase Welwyn AL6 0RR

Erection of a single storey side extension and a new garage on ground floor level, conversion of the existing garage and installation of an air source...

HOUSEHOLDER APPLICATION Welwyn Hatfield
24 Aug 2026 Under Consultation 6/2026/1381/EM

8 Meadow Green Welwyn Garden City AL8 6SS

Installation of 15 Panels on rear elevation

ESTATE MANAGEMENT Welwyn Hatfield
19 Aug 2026 Under Consultation 6/2026/1460/EM

14 Brockswood Lane Welwyn Garden City AL8 7BG

Fitting an air-to-air heat pump on a rear wall

ESTATE MANAGEMENT Welwyn Hatfield
7 Aug 2026 Pending 6/2026/1397/EM

44 Attimore Road Welwyn Garden City AL8 6LP

Installation of solar energy system of 14 solar panels

ESTATE MANAGEMENT Welwyn Hatfield
7 Aug 2026 Approved 6/2026/1396/EM

12 Mandeville Rise Welwyn Garden City AL8 7JU

Installation of 20 all-black roof-mounted solar PV panels (14 on west-facing and 6 on east-facing roof slopes); one Aira 8 kW air-source heat pump; on...

ESTATE MANAGEMENT Welwyn Hatfield
30 Jul 2026 Under Consultation 6/2026/1086/PN24

The Hub Tamblin Way Hatfield AL10 9EZ

Prior approval for installation of a roof-mounted solar PV system, comprising of 212 Solarwatt panels to a total system size of 95.4 kWp

Solar Panels/PV - PRIOR APPROVAL Welwyn Hatfield
29 Jul 2026 Under Consultation 6/2026/1324/EM

105 Handside Lane, Welwyn Garden City, AL8 6SP

Installation of solar panels and battery

ESTATE MANAGEMENT Welwyn Hatfield
22 Jul 2026 Under Consideration 6/2026/1292/EM

63 Parkway Welwyn Garden City AL8 6JF

Installation of solar panels to front and rear roof

ESTATE MANAGEMENT Welwyn Hatfield
22 Jul 2026 Under Consideration 6/2026/1238/EM

64 Oakdale Welwyn Garden City AL8 7QZ

Installing solar panels on the front-facing roof of the house

ESTATE MANAGEMENT Welwyn Hatfield
20 Jul 2026 Under Consideration 6/2026/1267/EM

21 Reddings Welwyn Garden City AL8 7LA

Installation of two external air-to-air heat pump units, which would be capable of providing heating and cooling to the property

ESTATE MANAGEMENT Welwyn Hatfield
13 Jul 2026 Under Consideration 6/2026/1200/HOUSE

98 Harmer Green Lane Digswell Welwyn AL6 0ES

Formation of front boundary gate with brick piers and erection of rear extension, rear orangery, side porch canopy, replacement front porch, alteratio...

HOUSEHOLDER APPLICATION Welwyn Hatfield
10 Jul 2026 Withdrawn 6/2026/0885/EM

166 Thistle Grove Welwyn Garden City AL7 4AQ

Installation of solar panels

ESTATE MANAGEMENT Welwyn Hatfield
9 Jul 2026 Approved 6/2026/1190/EM

10 Walden Road Welwyn Garden City AL8 7PF

Retrospective consent for the installation of a single external condenser unit for a reversible air-to-air heat pump

ESTATE MANAGEMENT Welwyn Hatfield
8 Jul 2026 Approved 6/2026/1172/EM

13 Barleycroft Road, Welwyn Garden City, AL8 6JX

Installation of air conditioning (air-to-air heat pump)

ESTATE MANAGEMENT Welwyn Hatfield
7 Jul 2026 Under Consideration 6/2026/1177/HOUSE

Red Lodge High Road Essendon Hatfield AL9 6HU

Erection of single-storey side extension, detached garage with barn-hipped roof and photovoltaic panels, relocated garden room and associated works to...

HOUSEHOLDER APPLICATION Welwyn Hatfield
3 Jul 2026 Under Consideration 6/2026/1158/FULL

Land To The West Of Ridgeway Road Ridgeway Welwyn Garden City AL7 2AA

Construction and operation of a micro energy storage project

FULL PERMISSION Welwyn Hatfield
16 Jun 2026 Approved 6/2026/1046/EM

67 Newfields Welwyn Garden City AL8 6YS

Installation of solar panels to side facing roof and rear extension flat roof and EV charger to front of house

ESTATE MANAGEMENT Welwyn Hatfield
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Welwyn Hatfield

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Welwyn Hatfield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Welwyn Hatfield. You can also narrow the alert to a postcode, street, or drawn area.

We check Welwyn Hatfield's planning portal daily. New solar & renewables applications appear here within a day of being published.