Solar and renewables in East Lindsey

East Lindsey received 26 renewable energy applications in the last 12 months, including 1 solar farm, 2 battery storage sites and 2 heat pumps. All 17 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for East Lindsey

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 7 of 7 applications
30 Oct 2026 Awaiting decision 01944/26/ASP

Morrisons Supermarket Wainfleet Road Skegness Lincolnshire PE25 3QT

Determination of whether or not prior approval is required for the installation, alteration or replacement of other solar PV equipment on the roof of ...

Prior Approval Solar Equip Non-Domestic East Lindsey
26 Oct 2026 Awaiting decision 01797/26/FUL

Solar Panels At Land South Of Hoop Lane Farm Hoop Lane Langton By Wragby Lincolnshire

Planning Permission - Siting of 20 no. solar panels arranged in 2 no. ground mounted solar arrays.

Full Planning Permission East Lindsey
15 Oct 2026 Awaiting decision 01821/26/192

4 Betts Mews Louth Lincolnshire LN11 9DS

Section 192 application to determine whether the Installation of external air to air heat pump to the rear off the property to be lawful.

LDC - Section 192 East Lindsey
15 Oct 2026 Approved 4 Nov 01824/26/ESR

Hogsthorpe Lakes Lowgate Road Hogsthorpe Lincolnshire PE24 5QE

Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to the...

EIA - Screening Option East Lindsey
1 Oct 2026 Awaiting decision 01685/26/FUL

Huttoft Bank Farm Huttoft Bank Huttoft Lincolnshire LN13 9RT

Planning Permission - Siting of 640 no. solar panels arranged in 5 no. ground mounted solar arrays.

Full Planning Permission East Lindsey
10 Sept 2026 Awaiting decision 01305/26/FUL

Land North Of Fendale Church Lane Croft Lincolnshire

Planning Permission - Erection of 4no. holiday lodges, stable block and reception building. Excavation of land to form a commercial fishing lake, prov...

Full Planning Permission East Lindsey
9 Sept 2026 Approved 24 Sep 01483/26/ESR

Pinetrees Caravan Park Croft Bank Croft Lincolnshire PE24 4RE

Environmental Impact Assessment (E.E.C. Directive 85/337/E.E.C. as amended by Council Directive 97/11E.C.) for a screening opinion with respect to cha...

EIA - Screening Option East Lindsey
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in East Lindsey

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in East Lindsey?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by East Lindsey. You can also narrow the alert to a postcode, street, or drawn area.

We check East Lindsey's planning portal daily. New solar & renewables applications appear here within a day of being published.