Solar and renewables in Charnwood

Charnwood received 29 renewable energy applications in the last 12 months, including 1 solar farm, 2 battery storage sites and 3 heat pumps. Of the 17 decided so far, 15 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

9
|
5
|
3
Get alerts for Charnwood

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
1 Sept 2026 REGISTERED: Under Consultation P/26/1149/2

16 Bath Street, Syston, Leicestershire, LE7 1GB

Installation of solar panels at rear of garden

Charnwood
1 Sept 2026 REGISTERED: Under Consultation P/26/1148/2

16 Bath Street, Syston, Leicestershire, LE7 1GB

Installation of solar panels at rear of garden (Listed building consent)

Charnwood
28 Aug 2026 Approved P/26/1231/2

Southfields Road Extension Car Park, Loughborough, LE11 2TS

Electric Vehicle Charging Hub and Solar Canopy within 16 existing parking spaces of the car park comprising 39kW of Solar Photovoltaics, 27kWh Batter...

Charnwood
25 Aug 2026 REGISTERED: Under Consultation P/26/1547/2

18 Park Road, Birstall, Leicestershire, LE4 3AU

Erection of single storey garage/outbuilding with roof mounted solar panels to side, installation of electric front gate dropped kerb and alteration t...

Charnwood
24 Aug 2026 REGISTERED: Under Consultation P/26/1411/2

1 Station Road, Rearsby, Leicestershire, LE7 4YX

Section 73 Variation of Condition 2 (Approved Plans) of Planning Application P/22/0908/2: - Conversion of existing single storey garage block into a t...

Charnwood
10 Jul 2026 Approved P/26/1182/2

959 Melton Road, Thurmaston, Leicestershire, LE4 8GQ

Erection of two storey side, single and two storey rear (following demolition of garage) and single storey front extensions. Removal of front boundary...

Charnwood
10 Jul 2026 Approved P/26/1106/2

11 Ploughlands, Quorn, Leicestershire, LE12 8WQ

Installation of photovoltaic panels to roof (Certificate of Lawfulness Proposed)

Charnwood
7 Jul 2026 Approved P/26/1177/2

53 A Swithland Lane, Rothley, Leicestershire, LE7 7SG

Installation of heat pump, air conditioning unit (heating and cooling) and solar panels to roof (Certificate of Lawfulness Proposed)

Charnwood
24 Jun 2026 Decided P/26/1078/2

57 Brick Kiln Lane, Shepshed, Leicestershire, LE12 9EJ

Non-material minor amendment to planning application ref: P/25/1233/2 (Alterations to roof including raising of ridge height to create habitable space...

Charnwood
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Charnwood

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Charnwood?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Charnwood. You can also narrow the alert to a postcode, street, or drawn area.

We check Charnwood's planning portal daily. New solar & renewables applications appear here within a day of being published.