152A High Street Aldeburgh Suffolk IP15 5AQ Data via plota.co.uk

DC/26/2611/FUL - Full Application Awaiting decision

Proposal

Change of use of first floor from gallery space to residential; create second floor; insert patio doors on the second floor to the rear and create a balcony over the existing rear bay window; insert dormer windows to the north and south side elevations; create an integral, partially open-fronted first floor terrace on the south elevation; raise the height of the rear chimney. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
3 Aug 2026
Decision
Expected by 28 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 6 Oct 2026 and 27 Oct 2026, from East Suffolk's recent changes of use.

Documents 25

All documents on the council site ↗

Site constraints 6

Grade II listed: The Suffolk
List entry 1269736 · 13 m from the pin · 13 more listed buildings within 150 m (13 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 13 with distances
Historic England ↗
Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Aldeburgh conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage coast: Suffolk
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Special protection area 129 m away: Outer Thames Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Inside the Aldeburgh built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
IP15 5AQ
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Aldeburgh And Leiston
Parish
Aldeburgh
Case officer
Show
Target decision
28 Sept 2026
Applicant
Show

Decision outlook

Day 40 of the 56-day target. East Suffolk usually decides changes of use by day 77.

Day 4037 days to the predicted decision (day 77)
33%decided within 8 weeks
72%approved
76decided in the last year

Plota live figures for changes of use decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

6comments received
6 objecting

100% object · above the UK average of 75%

5 neighbours consulted · Last counted 7 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
28 Sept 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Change of use

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026