5 Palace Road East Molesey Surrey KT8 9DJ Data via plota.co.uk

2026/1793 - Tree Conservation Area Approved

Proposal

East Molesey Kent Town Conservation Area - 1x Silver birch, reduce entire crown to shape, reducing height by 3-3.5m and lateral growth by 1-1.5m. Crown thin by 10%. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jul 2026
✓
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Last checked 12 Sept 2026

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
East Molesey Kent Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath about 14 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Air quality management area: Hampton Court AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Scheduled monument about 238 m away: Hampton Court Palace; 1 listed building within 150 m of the postcode pin; Inside the West Molesey built-up area.
Not affected
Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Tree Conservation Area
Postcode
KT8 9DJ
Received
23 Jul 2026
Validated
23 Jul 2026
Ward
Molesey East Ward
Decision
Raise No Objection
Decision date
25 Aug 2026

How this decision compares

Decided in 33 days from validation, 8 days faster than Elmbridge's median of 41 for tree and landscaping works. Approved, as 88% of tree and landscaping works here are.

97%decided within 8 weeks
88%approved
318decided in the last year

Plota live figures for tree and landscaping works decided by Elmbridge in the last twelve months, from validation. Elmbridge decision record →

Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 councils
Relevant to this application:
Other decisions

Elmbridge ranks #195 out of 296 councils for householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026