68 King William Street London EC4N 7HR Data via plota.co.uk

26/00787/FULL - Full Planning Permission Under Consideration

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 to vary planning permission dated 30/07/2020 (Original permission ) to omit Condition 13 (preventing use of terrace between midnight and 0800 the following day and not at all on Sundays and Bank Holidays). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jun 2026
✓
Validated
15 Jul 2026
✓
Consultation
17 Jul 2026
Decision
Target date was 9 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 9 Sept 2026.

The consultation period closed on 18 Aug 2026.

Associated applications 4

  • Part of

    FullApprovedcouncil archive

    Conditions , varied

Licence at this address

  • Licence Wagtail Premises licence · in force since 2 Sep 2026 Licensed hours: alcohol until 01:30

Licensed hours are what the licence permits, not opening times.

Site constraints 10

Bank conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 158 m away: Thames Tideway Tunnel
The site is about 158 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 261 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
27 listed buildings within 150 m of the postcode pin
Nearest: Church of St Clement, Grade I, about 17 m from the postcode pin · 4 Grade I, 1 Grade II*, 22 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 27 with distances
Historic England ↗
Scheduled monument about 110 m away: Roman governor's palace (site of)
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 18 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £492,000 in November 2021. Other property, leasehold.

26 November 2021£492,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
EC4N 7HR
Received
1 Jun 2026
Validated
15 Jul 2026
Ward
Candlewick
Case officer
Show
Target decision
9 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Keystone Law
Leaseholder
Show

Public comments

No public comments yet.

23 neighbours consulted · Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14945558
Planning Portal ref
PP-14945558
Neighbours
20 Jul 2026
Consultation
17 Jul 2026
Comments by
18 Aug 2026
Site or press notice
24 Jul 2026
Statutory expiry
9 Sept 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.