35 - 43 Bondway London SW8 1SJ Data via plota.co.uk

25/02795/FUL - Full Planning Permission Approved

Proposal

Change of use from hostel for use by single homeless men (Sui Generis) to hostel for use as visitor accommodation (Sui Generis) and associated external works including cycle parking and a refuse store. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2025
✓
Approved
12 Oct 2026

Approved on 12 Oct 2026 · Committee Decision · Last checked 18 Oct 2026

Planning committee

Decided by Lambeth Planning Applications Committee on 23 Jun 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the vacant building could be reused for visitor accommodation with acceptable land use, amenity and transport impacts.
  • Two objections raised concerns about local need, fire-exit access, nightclub security and noise.
  • The committee unanimously granted conditional permission, subject to a Section 106 deed and delegated authority.
Read how the committee decided The proposal, site history, officers’ assessment, objections, committee decision and planning conditions.

Source: Plota analysis of Lambeth's committee minutes of 23 Jun 2026.

Documents 49

Plans & drawings 34

PDF COMPLETED S106 Section 106 · 12 Oct 2026 View ↗ PDF DRAFT S106 Section 106 · 28 Sept 2026 View ↗ PDF HOSTEL MANAGEMENT PLAN ADDENDUM Supporting Docs · 12 Mar 2026 View ↗ PDF HOSTEL MANAGEMENT PLAN Supporting Docs · 2 Mar 2026 View ↗ PDF EXISTING PLAN GROUND FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED ELEVATIONS LIGHTWELL Plans · 4 Sept 2025 View ↗ PDF EXISTING SECTION BB Plans · 4 Sept 2025 View ↗ PDF EXISTING SECTION DD Plans · 4 Sept 2025 View ↗ PDF DRAFT DELIVERY & SERVICING PLAN Supporting Docs · 4 Sept 2025 View ↗ PDF HOSTEL OPERATION MANAGEMENT PLAN Supporting Docs · 4 Sept 2025 View ↗ PDF EXISTING AND PROPOSED BLOCK PLAN Plans · 4 Sept 2025 View ↗ PDF EXISTING PLAN ROOF Plans · 4 Sept 2025 View ↗ PDF EXISTING SECTION AA Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN FIRST FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED SECTION BB Plans · 4 Sept 2025 View ↗ PDF EXISTING AND PROPOSED ELEVATION WEST TO BONDWAY Plans · 4 Sept 2025 View ↗ PDF EXISTING AND PROPOSED ELEVATION SOUTH Plans · 4 Sept 2025 View ↗ PDF EXISTING PLAN FIRST FLOOR Plans · 4 Sept 2025 View ↗ PDF EXISTING PLAN THIRD FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN SECOND FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN BASEMENT Plans · 4 Sept 2025 View ↗ PDF EXISTING ELEVATIONS LIGHTWELL Plans · 4 Sept 2025 View ↗ PDF EXISTING SECTION CC Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN ROOF Plans · 4 Sept 2025 View ↗ PDF EXISTING AND PROPOSED ELEVATION EAST Plans · 4 Sept 2025 View ↗ PDF EXISTING AND PROPOSED ELEV EAST + SOUTH THIRD FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED SECTION DD Plans · 4 Sept 2025 View ↗ PDF EXISTING PLAN SECOND FLOOR Plans · 4 Sept 2025 View ↗ PDF EXISTING PLAN BASEMENT Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN THIRD FLOOR Plans · 4 Sept 2025 View ↗ PDF PROPOSED PLAN GROUND FLOOR Plans · 4 Sept 2025 View ↗ PDF LOCATION PLAN OS Map · 4 Sept 2025 View ↗ PDF PROPOSED SECTION AA Plans · 4 Sept 2025 View ↗ PDF PROPOSED SECTION CC Plans · 4 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Vauxhall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Modified Direction 1 - CAZ. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 502 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Vauxhall
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
7 listed buildings within 150 m; Inside the Lambeth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £6,480,000 in March 2025. Other property, freehold.

21 March 2025£6,480,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lambeth
Application type
Full Planning Permission
Postcode
SW8 1SJ
Received
4 Sept 2025
Validated
4 Sept 2025
Ward
Vauxhall
Case officer
Show
Target decision
13 Oct 2026
Decision
Grant Permission
Decision date
12 Oct 2026
Decision level
Committee Decision
Applicant
Show
Agent
Turley

How this decision compares

Decided in 403 days from validation, 347 days slower than Lambeth's median of 56 for full applications. Approved, as 79% of full applications here are.

50%decided within 8 weeks
79%approved
1,267decided in the last year

Plota live figures for full applications decided by Lambeth in the last twelve months, from validation. Lambeth decision record →

Public comments

1comment received
1 objecting

47 neighbours consulted · Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
12 Oct 2026
Committee
23 Jun 2026
Statutory expiry
4 Dec 2025
Env. assessment
No
Lambeth
Planning Authority Score
2.7/10
Poor
#242 of 296 councils
Relevant to this application:
Change of use

Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lambeth decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #274 of 296
81%
Householder approved
Below avg (90%) #273 of 296
62%
Decided in 8 weeks
Below avg (63%) #164 of 296
47%
Extended time limit
Above avg (41%) #209 of 296
46%
Minor dwellings approved
70 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
42%
Change of use approved
53 decided
1,784
Total decisions
396 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.